BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Westerly, Rhode Island. Completed plans call for site work for a one-story above grade water / sewer project.

The Town of Westerly RI is seeking sealed bids for construction of Nitrogen Reduction Upgrades at the Wastewater Treatment Facility. The project generally consists of process improvements to secondary treatment including two new aeration tanks, intermediate pumping facilities, process equipment and building upgrades throughout the Wastewater Treatment Facility, a new electrical service, emergency power, and new facility wide automation and controls. Bids must be submitted on the prescribed Bid Form. The successful bidder will be required to furnish the additional bond(s) and insurance prescribed in the bidding documents. The Town of Westerly, as a recipient of State Revolving Loan Funds, requires that the bidder complies with all Federal and State flow-down requirements prescribed in the bidding documents. The Town reserves the right to reject any and all bids or parts thereof, or to waive irregularities in the bids received, and to accept the bid or parts thereof deemed to be most favorable to the best interest of the Town.

GC Bidding

Water / Sewer

$6,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
223
Bidding Soon
3,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 4, 2026

Project location map

87 Margin Street, Westerly, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.