Site work for a water / sewer project in Hemet, California. Completed plans call for site work for a water / sewer project.
The City of Hemet is seeking a qualified Contractor to provide all necessary labor, equipment, tools, and materials to perform the removal of two existing pumps and control panels and supply and installation of two new pumps and control panels located within Hemets city limits, in accordance with the included bid specifications. Q&A Deadline 12/22/2025 3:00 PM (PST) All general or bidding inquiries shall be directed to the Q & A Section of the Bid Page. Questions will not be answered verbally or in an email. Pump 1 - Located Inside Pump Control Area at Stoney Mountain Ranch Q'ty Item Description 1 Equipment Replacement Equipment, to include: 1 4SE5044L Barnes Pumps 4SE5044L Submersible Sewage, 4" Discharge, 5 HP, 460 Volt, 60 Hz, Three Phase, 1750 RPM. P/N: 4SE5044L 1 PANEL Simplex Municipal Wastewater Pumping Control Panel for operation on 460V 3O incoming power. To control 1 - 5 hp 9 F.L.A. Submersible Pumps. To Include: NEMA Type 4X - 304 Stainless Steel Enclosure, with back panel Aluminum Dead-front Inner Door Circuit breaker cutouts with mounting bracket Incoming Power Terminal Block Control Power Transformer with Primary Fuses Control Power Circuit Breaker Alarm Power Circuit Breaker 1 - Manual Starter / IEC Contactor TPC-X Primary Controller DPC-4F Secondary Controller 1 - 22mm Hand Off Auto Switch 1 - 22mm Run Pilot Light 1 - Elapsed Time Meter 1 - 22mm High Alarm Pilot Light, Alarm Activation, and Aux Contact 1 - 22mm Low Alarm Pilot Light, Alarm Activation, and Aux Contact 22mm Backup Active Pilot Light, Manual Reset Pushbutton, Alarm Activation, and Aux Contact 1 - 22mm Motor Heat Sensor Pilot Light, Alarm Activation, and Aux Contact 1 - Macromatic 22mm Seal Failure Pilot Light, Alarm Activation, and Aux Contact 1 - 22mm Pump Fail Pilot Light, Alarm Activation, and Aux Contact 1 - Pump 1 Run Aux Contact LED Alarm Light Horn Audible Alarm 22mm Silence Pushbutton 22mm Test Pushbutton Engraved Nameplates UL Label 508 Self Laminating Wire Numbers Control Relays as required Terminal Blocks and Ground Lugs as Required 1 PBLT2-10-40-PU Submersible level Transducer, range 0-10psi, 23.1 ft, 40 ft polyurethane cable, P/N: PBLT2-10-40-PU 2 40SGMPCNO Backup Float Switches. 40' long mechanical activated float switch, NO, SJE Rhombus P/N 100646S 1 Check Valve 4" Flanged Swing Check Valve 1 11Misc. Misc materials include: PVC SCH80 Fittings and Piping, Unistruts, and etc. 1 Field Scope of Work: - Perform confined space entry to access to existing storm water pump - Disconnect and remove existing pump out from manhole - Replace and install (1) new replacement pump in manhole and connect to existing discharge piping - Install (1) new 4" Cast Iron Swing Check Valve - Install (1) Submersible Pressure Transducer and (2) Backup Float Switches in manhole - Disconnect and remove (1) existing control panel - Replace and Install (1) New Simplex Control Panel at same location - Pull pump cable through existing electrical conduit from manhole to new control panel - Electrical connection in new control panel - Calibrate the new pressure transducer - Program the pump controller on panel - Test to operate the new pump in hand and auto mode Notes: 1. Discharge pipe(s) shall be existing. No slide rail system is included. 2. Freight is included. Pump 2 - Located Outside Pump Control Area at Stoney Mountain Ranch Q'ty Item Description 1 Equipment Replacement Equipment, to include: 1 4SE5044L Barnes Pumps 4SE5044L Submersible Sewage, 4" Discharge, 5 HP, 460 Volt, 60 Hz, Three Phase, 1750 RPM. P/N: 4SE5044L 1 PANEL Simplex Municipal Wastewater Pumping Control Panel for operation on 460V 3O incoming power. To control 1 - 5 hp 9 F.L.A. Submersible Pumps. To Include: NEMA Type 4X - 304 Stainless Steel Enclosure, with back panel Aluminum Dead-front Inner Door Circuit breaker cutouts with mounting bracket Incoming Power Terminal Block Control Power Transformer with Primary Fuses Control Power Circuit Breaker Alarm Power Circuit Breaker 1 - Manual Starter / IEC Contactor TPC-X Primary Controller DPC-4F Secondary Controller 1 - 22mm Hand Off Auto Switch 1 - 22mm Run Pilot Light 1 - Elapsed Time Meter 1 - 22mm High Alarm Pilot Light, Alarm Activation, and Aux Contact 1 - 22mm Low Alarm Pilot Light, Alarm Activation, and Aux Contact 22mm Backup Active Pilot Light, Manual Reset Pushbutton, Alarm Activation, and Aux Contact 1 - 22mm Motor Heat Sensor Pilot Light, Alarm Activation, and Aux Contact 1 - Macromatic 22mm Seal Failure Pilot Light, Alarm Activation, and Aux Contact 1 - 22mm Pump Fail Pilot Light, Alarm Activation, and Aux Contact 1 - Pump 1 Run Aux Contact LED Alarm Light Horn Audible Alarm 22mm Silence Pushbutton 22mm Test Pushbutton Engraved Nameplates UL Label 508 Self Laminating Wire Numbers Control Relays as required Terminal Blocks and Ground Lugs as Required 1 PBLT2-10-40-PU Submersible level Transducer, range 0-10psi, 23.1 ft, 40 ft polyurethane cable, P/N: PBLT2-10-40-PU 2 40SGMPCNO Backup Float Switches. 40' long mechanical activated float switch, NO, SJE Rhombus P/N 100646S 1 Check Valve 4" Flanged Swing Check Valve 1 11Misc. Misc materials include: PVC SCH80 Fittings and Piping, Unistruts, and etc. 1 Field Scope of Work: - Perform confined space entry to access to existing storm water pump - Disconnect and remove existing pump out from manhole - Replace and install (1) new replacement pump in manhole and connect to existing discharge piping - Install (1) new 4" Cast Iron Swing Check Valve - Install (1) Submersible Pressure Transducer and (2) Backup Float Switches in manhole - Disconnect and remove (1) existing control panel - Replace and Install (1) New Simplex Control Panel at same location - Pull pump cable through existing electrical conduit from manhole to new control panel - Electrical connection in new control panel - Calibrate the new pressure transducer - Program the pump controller on panel - Test to operate the new pump in hand and auto mode Notes: 1. Discharge pipe(s) shall be existing. No slide rail system is included. 2. Freight is included.
Bid Results
Water / Sewer
$82,774.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 29, 2025
January 28, 2026
To Be Determined, Hemet, CA
Related To This Project
Hemet, CA
Bid Date: Jan 13 2026
Hemet, CA
Bid Date: Jan 07 2026
Hemet, CA
Bid Date: Jan 15 2026
Hemet, CA
Bid Date: Jan 27 2026
Hemet, CA
Bid Date: Nov 20 2025
Hemet, CA
Bid Date: Nov 18 2025
Hemet, CA
--
Hemet, CA
Bid Date: Nov 20 2025
Hemet, CA
Bid Date: Nov 22 2025
Hemet, CA
--
Hemet, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.