BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Site work for a water / sewer project in Walhalla, South Carolina. Completed plans call for site work for a water / sewer project.

Division IV - Water System Improvement Project includes the installation of approximately 3,600-LF of 10-inch water lines in the Poplar Springs Road Area; as well as other associated work tasks for a complete and proper installation. Performance and Payment Bonds, each in the amount of 100% of the contract price will be required of the successful bidder. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. The Owner reserves the right to reject any or all bids or waive any informality in the bidding. The Owner anticipates award of the contract within thirty (30) days from the date of the opening of bids; however, to allow adequate time for funding agency approval, bids may be held by the Owner for a period not to exceed ninety (90) days from the date of the opening of bids. Question Deadline 12/11/2025 Questions concerning the project should be emailed to Rich Anderson at randerson@summitengineeringgroup.com PROJECT DESCRIPTION A. The project will generally require the following work activities: o Installation of approximately 3,600-LF of 10-inch water lines in the Poplar Springs Rd Area; as well as other associated work tasks for a complete and proper installation. o Work Site Restoration. o Other associated appurtenances for a complete and proper installation. B. General Information: 1. All work will be confined to the existing road rights of way and the Contractor shall take great care to ensure that all areas affected by construction activities are returned to original or better conditions. 2. Safety of area residents, construction personnel, and others associated with the project shall be given high priority at all times. 3. Strict adherence to daily clean-up requirements shall be expected of Contractor personnel, subcontractors, etc. Construction activities may be halted by the Engineer or the Owner should Contractor personnel, subcontractors, etc. fail to adhere to this requirement. No additional payment for such stoppage will be granted by the Owner. 4. Existing utilities damaged during construction shall be immediately repaired and placed back into service

GC Bidding

Water / Sewer

$800,000.00

Public - City

Site Work

16

10

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
81
Bidding Soon
1,671
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

Poplar Springs Rd, Walhalla, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.