BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work and paving for a mixed-use development in San Angelo, Texas. Design plans call for site work for a 320,000-square-foot bridge / tunnel; and for paving for a sidewalk / parking lot.

Plans call for river bank stabilization, walking trail re-alignment and pedestrian bridge/ramp structure, overall project area approximately 320,000 square-foot. As of December 12, 2025, information regarding general contractor selection timeline has not been released. Construction is slated to begin in June 2026 with completion date of June 2027.

Design

Bridges / Tunnels

$7,997,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Rio Concho Dr, San Angelo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.