BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2026 at 7:00 PM

Updated January 10, 2026

Site work and paving for a bridge / tunnel in West Nyack, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Rockland Green is seeking proposals for the fabrication of a steel pedestrian bridge and deflector plate improvements at the Clarkstown Transfer Station. Rockland Green is seeking proposals for fabrication of a steel pedestrian bridge and deflector plate improvements. The attention of the Proposers is directed to the applicable federal, state, and local law requirements and to the Affidavit of Non-Collusion in the proposal forms. Rockland Green encourages the fullest possible utilization of minority and women's business enterprises (M/WBE's). All proposals shall be submitted in sealed envelopes and shall be plainly marked on the outside with the statement "RFP 2025-08" with the Proposer's name and the title of the RFP. The attention of the Proposers is directed to the applicable federal, state, and local law requirements and to the "Affidavit of Non-Collusion" in the proposal forms. Rockland Green's objective is to execute a contract with a qualified proposer to provide the following services: A. The Proposer shall furnish all materials, equipment, and labor for installing the following items, all in accordance with the drawings, specifications, and requirements of RFP-2025-08. B. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store at a location inside the Clarkstown Transfer Station building where directed by Rockland Green. C. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, C-channel supports, protective plates, and a 1-1/2 inch galvanized steel I-Bar Grating, complete, all in accordance with the drawings and technical specifications prepared by EDR (Engineer). D. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions as shown on the drawings and approved by Rockland Green. work shall be substantially complete by June 1, 2026 Question Deadline 12/15/2025 All questions concerning this RFP must be submitted in writing by the deadline in the schedule above, to Dee Louis at dlouis@rocklandgreen.com.

Post-Bid

Bridges / Tunnels

$1,800,000.00

Public - County

Paving, Site Work

9

10

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 2, 2026

Project location map

166 NY-303, West Nyack, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.