BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Torrey, Utah. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

SR-24 over Sulphur Creek, Bridge Replacement Question Deadline 01/06/2026 at 11:00 AM MT Deadline to submit Questions electronically. One-on-One Meetings: The time for this will be adjusted and individual appointments will be sent out for each firm requesting a meeting by the due date outlined in the Solicitation. Deadline to Request One-on-One Meeting N/A Last opportunity to request a One-on-One meeting with the Project Manager to ask specific project-related questions. Selection Team Meeting Nephi, Utah It is critical that all team members attend this meeting. Please look at and adjust your schedule, as necessary. We will meet to select a consultant or determine if interviews are necessary. If interviews are necessary, we will determine the interview format and develop the questions. Please bring a laptop, tablet, or another electronic device with access to the internet as we will be using Bonfire during this meeting. Jan 21st 2026, 12:00 AM MST Mandatory - Yes TENTATIVE: Consultant Selection Interviews TBD This meeting is tentative, based on the final scores at the Selection Team Meeting. If interviews are necessary, the time of the appointment will be adjusted according to the number of firms being interviewed. I tried to accommodate as many schedules as possible, but may need your help to move your appointments around if we do go to interviews on the Selection. Please bring a laptop, tablet, or other electronic devices with access to the internet as we will be using Bonfire during this meeting. Jan 27th 2026, 12:00 AM MST Mandatory - No

Conceptual

Bridges / Tunnels

$700,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
7
Bidding Soon
68
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

January 6, 2027

Project location map

UT-24, Torrey, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.