Published January 17, 2026 at 7:00 PM
Updated January 18, 2026
Site work and paving for a sidewalk / parking lot in Greenwood Village, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project consists of providing all material, equipment, and labor for the above five sections of trail with location specific details described below. All landscaping surrounding the trails shall be preserved and reset once paving is complete. Landscape restoration is dependent on areas disturbed during construction but may include topsoil, resetting and topdressing landscaping mulch, sod and/or seed, and erosion control. Any traffic control, including pedestrian detours, required to complete the work shall be included in the work and will not be paid separately. The project is located in five separate areas and is shown on the map in Appendix 3. Section 1 is located between E Prentice Circle and S Dayton St. Section 2 is located in Cattail Park and is the eastern most section of trail which connects to Red Fox Ln. Section 3 is located on the east side of S Holly St, between E Powers Ave and E Orchard Dr. Section 4 is located on the east side of S Monaco St between E Dorado Pl and E Dorado Ave. Section 5 is located along Greenwood Estates Trail, from S Monaco St to E Dorado Ave. All work shall be completed in accordance with these Specifications and the most current Metropolitan Government Pavement Engineers Council (MGPEC), Pavement Design Standards and Construction Specifications Manual, and Colorado Department Of Transportation, Standard Specifications for Road and Bridge Construction, except as modified in the Project Special Provisions and Revisions to Sections. Work to be completed consists of furnishing all labor, materials, equipment, accessories, and performing all operations to complete the project work in accordance with the Drawings and Specifications. The Contractor is required to visit the project site to carefully examine the proposed work. The Contractor shall also thoroughly review the Drawings and Specifications. Contractor shall satisfy as to the character, quality, and quantities of work to be performed, materials to be furnished, and as to the requirements of these Specifications. Trails Rehabilitation Project Question Acceptance Deadline 01/14/2026 04:00 PM EST Questions are submitted online Yes
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
May 22, 2026
Multiple Locations, Greenwood Village, CO
Related To This Project
Greenwood Village, CO
Bid Date: Jan 30 2026
Greenwood Village, CO
Bid Date: Jan 07 2026
Greenwood Village, CO
Bid Date: Feb 20 2026
Greenwood Village, CO
Bid Date: Feb 27 2026
Greenwood Village, CO
--
Greenwood Village, CO
Bid Date: Dec 19 2025
Greenwood Village, CO
Bid Date: Dec 19 2025
Greenwood Village, CO
Bid Date: Dec 03 2025
Greenwood Village, CO
--
Greenwood Village, CO
Bid Date: Dec 03 2025
Greenwood Village, CO
Bid Date: Dec 05 2025
Greenwood Village, CO
Bid Date: Nov 14 2025
Greenwood Village, CO
Bid Date: Oct 28 2025
Greenwood Village, CO
Bid Date: Oct 13 2025
Greenwood Village, CO
Bid Date: Oct 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.