BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work for a water / sewer project in Sioux Falls, South Dakota. Completed plans call for site work for a water / sewer project.

42-Inch Ductile Piping and Fittings The City of Sioux Falls reserves the right to reject any or all bids, waive technicalities, and make award(s) as deemed to be in the best interest of Sioux Falls, SD. Question Deadline 12/11/2025 at 2:00 PM CT All questions regarding the bid shall be directed to Purchasing, Third Floor, City Hall, 224 West Ninth Street, P.O. Box 7402, Sioux Falls, SD 57117-7402; telephone 605-367-8013. This materials procurement scope consists of the furnishing of all 42-inch Restrained Joint Water Main Piping and Fittings for the Phase 2, Minnesota Avenue, From 2nd Street to 7th Street Reconstruction Project for the City of Sioux Falls. All materials must arrive at the project site on or after March 30, 2026, and no later than June 1, 2026. Liquidated damages, as specified in Section 8 of the City of Sioux Falls General Conditions for Public Improvements, will be charged for failure to deliver the materials on or before the contract delivery date of June 1, 2026. The intent of the following specifications and notes is to describe, in sufficient detail, the 42- inch Restrained Joint Water Main Piping and Fittings. All parts and incidentals not specifically mentioned, including, but not limited to gaskets and bolts, which are necessary in order to provide the 42-inch Restrained Joint Water Main Piping, Fittings, and Valve shall be included in the bid and shall conform to the City of Sioux Falls Supplemental Standard Specifications for Water Main Construction. Delivery, unloading, and storage, including schedule and location for the 42-inch Piping Materials procured will be coordinated by the Construction Contractor of the project associated with these procured materials. The cost for delivery to Sioux Falls at a site designated by the Construction Contractor is to be included in the furnished price of the 42- inch Piping and Fittings being procured. Award of the Construction Contract to a Contractor is anticipated to be in late February or early March of 2026.

Award

Water / Sewer

$2,127,594.00

Public - City

Site Work

10

8

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

March 30, 2026

Project location map

N Minnesota Ave, Sioux Falls, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.