Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Renovation of a military facility in Toronto, Ontario. Completed plans call for the renovation of a military facility.
Provide labour, materials, equipment and services necessary for a complete Building Automation System (BAS) comprised of various types of BACnet Testing Laboratories (BTL) listed BACnet-communicating Direct Digital Control (DDC) controllers (referred to as "BAS Controllers"), BTL listed BACnet-communicating operator interface software, conventional electric/electronic controls, and equipment-mounted controls. System is to be fully functional and include software and hardware for specified capabilities. .2 Refer to Section entitled Automatic Control Systems for requirements regarding control valves, control dampers, actuators, sensors/transmitters, switches/auxiliary control devices, and other similar field devices. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. 1 Provide labour, materials, equipment and services necessary for a complete Building Automation System (BAS) comprised of various types of BACnet Testing Laboratories (BTL) listed BACnet-communicating Direct Digital Control (DDC) controllers (referred to as "BAS Controllers"), BTL listed BACnet-communicating operator interface software, conventional electric/electronic controls, and equipment-mounted controls. System is to be fully functional and include software and hardware for specified capabilities. .2 Refer to Section entitled Automatic Control Systems for requirements regarding control valves, control dampers, actuators, sensors/transmitters, switches/auxiliary control devices, and other similar field devices. .3 Summary of Project Scope: .1 Connect new BAS to existing base building system (Niagara Tridium V.3.8.38 located in building 201) for control and monitoring. .4 Integrate and coordinate controls required by this project into a single system as follows: .1 Each supplier of a controls product is responsible for installation, configuration, programming, start-up and testing of that product unless otherwise stated. .2 Coordinate resolution of any incompatibility issues between BAS products provided under this section and those provided elsewhere in Contract Documents. Equipment/system manufacturer/supplier is responsible for supplying technicians that are to be available to troubleshoot any issues and coordinate with contractor. .3 Be responsible for material and labour to interconnect control products provided by multiple suppliers regardless of where these products are described within Contract Documents. .4 Coordinate to ensure sufficient space and power for BAS components is provided/available. .5 Resolve any conflicts that arise in control of same equipment by both BAS and fire alarm systems. Coordinate with fire alarm system manufacturer and installing contractor to resolve any issues that arise. Fire alarm system control is to be given priority, except where stated otherwise. .1 Work under this Contract covers the supply of all labour, materials and equipment required to carry out Construction in accordance with the Contract Documents. Work includes but is not limited to the following: .1 Preparation: .1 Establish lockable construction work site, erect construction barriers in accordance with Section 01 56 00, to applicable standards and as indicated on drawings. .2 When there are occupants in the same building as construction or the building becomes occupied prior to substantial completion, the Contractor must maintain a 1 hour fire separation as required by Section 01 56 00. .3 Post all construction signage and safety signage as required by regulatory agency. .2 Construction: .1 Refer to specification Section 00 01 10 describing the Scope of Work. .2 Removal of materials from the site must meet Section 01 35 43. .3 Contractor will be responsible for obtaining a licensed hauler and receiver for the transport and recycling of any hazardous materials. .4 Contractor will submit a manifest upon completion of the work in accordance with Sections 01 35 34. .5 Upon Completion of work, transport any hazardous material waste off-site to approved receiver. Submit manifest prior to submission of final progress claim. 1 Perform total mechanical systems testing, adjusting, and balancing. Requirements include measurement and establishment of fluid quantities of mechanical systems as required to meet design specifications and comfort conditions, and recording and reporting results. .2 Mechanical systems to be tested, adjusted and balanced include: .1 TAB of air handling systems is to include equipment and ductwork air temperatures, capacities and flows. .1 Include for but not be limited to following: .1 preparing and submitting preliminary coordination study and short circuit calculations and recommendations on required relays, sensors and CT's for proper system selective coordination and protection; .2 determining short-circuit current ratings to check that electrical distribution equipment can safely withstand level of fault current; .3 preparing, determining and submitting arc flash study with calculations to ensure required electric shock and arc flash protection are provided; .4 product manufacturers providing equipment inspection, testing, start-up, adjustments and verification; .5 independent 3 rd party testing of electrical distribution system equipment and associated products; .6 independent 3 rd party testing of systems and equipment as noted; .7 electricians/trades people on site to handle equipment, make temporary connections, operate equipment and make repairs and adjustments and assist manufacturer's / testing organization's personnel during on-site inspection, testing, calibration, start-up, verification work and where supplementary commissioning;
Sub-Bidding
Military
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2025
January 19, 2026
1133 Sheppard Ave W, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Dec 09 2025
Toronto, ON
Bid Date: Jan 19 2026
Toronto, ON
Bid Date: Dec 31 2025
Toronto, ON
Bid Date: Jan 06 2026
Toronto, ON
Bid Date: Jan 07 2026
Toronto, ON
Bid Date: Jan 21 2026
Toronto, ON
Bid Date: Dec 16 2025
Toronto, ON
Bid Date: Jan 14 2026
Toronto, ON
Bid Date: Jan 12 2026
Toronto, ON
Bid Date: Jan 13 2026
Toronto, ON
Bid Date: Jan 14 2026
Toronto, ON
--
Toronto, ON
Bid Date: Dec 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
