BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Demolition, site work and new construction of a transportation facility in Chicago, Illinois. Completed plans call for the demolition of a transportation facility; for the construction of a 22,500-square-foot transportation facility; and for site work for a transportation facility.

A major infrastructure upgrade is underway as the existing State/Lake station will be replaced with a modern, fully accessible rail hub designed by a world-renowned architecture firm. The $444 million project marks a significant increase from its original 2017 estimate of $75 million, reflecting expanded scope and enhanced amenities. The centerpiece of the new station will be a striking glass and metal canopy spanning the entire double-width platform and station area. Key improvements include: -ADA-compliant access with four new elevators at each street corner and two escalators. -Flyover bridge for easy platform crossover. -Connection to the underground Red Line station with fewer columns and greater vertical clearance. -Wider platforms, improved lighting, updated signage, and maximized glass areas for enhanced security. -Energy-efficient LED lighting and improved sidewalk crossings with bump-outs. As of January 14, 2026, preparatory work began last fall, and the platform closed to passengers on January 5, 2026. During construction, trains will bypass the station while maintaining existing routes. Surrounding streets will remain narrowed to a single lane, with intermittent closures and detours as needed. The new station is expected to open in 2029, delivering a safer, more accessible, and welcoming experience for riders. Design team and contractor have been identified.

Under Construction

Transportation Terminals

$444,347,400.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
697
Active Projects
376
Bidding Soon
3,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

N State St & W Lake St, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.