Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Renovation of a medical facility in San Antonio, Texas. Completed plans call for the renovation of a 2,766-square-foot medical facility.
The Sky Tower was built in 2012 and during construction an area (shell space Operating rooms 7 and 9) that was assigned for future operating rooms, was left ready to install an MRI. University Health is commissioning a major construction and capital project for Operating Rooms 7 & 9, which will encompass two operating rooms and a MRI diagnostic room. One operating room configuration is specially equipped to provide a 3-Telsa intraoperative MRI capability as well as an ability to run both operating rooms simultaneously with routine inpatient diagnostic imaging. Perioperative Services is requesting the acquisition of one (1) IMRIS InVision 3T Operating Suite. The acquisition of the IMRIS InVision 3T Operating Suite will allow University Hospital to deliver unmatched intraoperative multi-modal imaging to assist in surgical decision-making and enhance precision treatment. Question Deadline 01/07/2026 at 5:00 PM CT Questions will be received at online. pn-250168cz, MD63941 RFCSP-225- 10-046-CNST
Post-Bid
Medical
$10,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
March 25, 2026
4502 Medical Dr, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Jan 06 2026
San Antonio, TX
Bid Date: Jan 12 2026
San Antonio, TX
--
San Antonio, TX
Bid Date: Dec 15 2025
San Antonio, TX
Bid Date: Jan 06 2026
San Antonio, TX
Bid Date: Jan 23 2026
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jan 15 2026
San Antonio, TX
Bid Date: Dec 29 2025
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jan 27 2026
San Antonio, TX
--
San Antonio, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
