Published January 7, 2026 at 7:00 PM
Updated January 8, 2026
Site work for a water / sewer project in North Bend, Washington. Completed plans call for site work for a one-story above grade water / sewer project.
**As of January 02, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The project consists of two schedules of work. Schedule A consists of installing approximately 900 linear feet of 8-inch and 12-inch ductile iron water main to replace existing asbestos cement and PVC water main on SE North Bend Way as shown on the Plans and as described in the Specifications. Schedule A also includes abandoning water main and filling with CDF, installing water services and hydrants, hot mix asphalt trench restoration, concrete road restoration, and general restoration. Schedule B consists of installing approximately 1,200 linear feet of 8-inch ductile iron water main to replace existing asbestos cement water main on SE Mount Si Road and SE 128th Place as shown on the Plans and as described in the Specifications. Schedule B also includes installing water services and hydrants, hot mix asphalt trench restoration, and general restoration. The Work shall be substantially complete within 40 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the Sallal Water Association, North Bend, Washington. The project consists of two schedules of work. Schedule A consists of installing approximately 900 linear feet of 8-inch and 12-inch ductile iron water main to replace existing asbestos cement and PVC water main on SE North Bend Way as shown on the Plans and as described in the Specifications. Schedule A also includes abandoning water main and filling with CDF, installing water services and hydrants, hot mix asphalt trench restoration, concrete road restoration, and general restoration. Schedule B consists of installing approximately 1,200 linear feet of 8-inch ductile iron water main to replace existing asbestos cement water main on SE Mount Si Road and SE 128th Place as shown on the Plans and as described in the Specifications. Schedule B also includes installing water services and hydrants, hot mix asphalt trench restoration, and general restoration. Contract questions shall be directed only to the office of the Project Engineer.
Bid Results
Water / Sewer
$828,549.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2025
February 23, 2026
SE 128th Pl & SE Mount Si Rd, North Bend, WA
Related To This Project
North Bend, WA
Bid Date: Dec 18 2025
North Bend, WA
Bid Date: Nov 07 2025
North Bend, WA
Bid Date: Oct 13 2025
North Bend, WA
--
North Bend, WA
--
North Bend, WA
Bid Date: Jul 24 2025
North Bend, WA
--
North Bend, WA
--
North Bend, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.