BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work for a sidewalk / parking lot in El Cerrito, California. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

The work consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for the Swim Center Accessible Parking Improvements Project. The general items of work include removing and replacing existing sidewalk and parking lot paving, removing existing planter and replacing with a new stormwater treatment planter, adding new accessible paths of travel, and installation of electrical vehicle charging stations. The required contractor's license classification is Class A. Prospective bidders must confirm their firm is on the planholders list at BPXpress to ensure receipt of any communications, such as Addenda. Should a bidder find discrepancies in, or omissions from the Plans or Specifications, or should it be in doubt as to their meaning, the bidder shall contact the following individuals: o Albert Wege, awege@swinerton.com o Bob Addiego, raddiego@swinerton.com o Danny Stringer, danny.stringer@rsm-de.com Should it be found that the point in question is not clearly and fully set forth, a written Addendum will be sent to all persons receiving a set of documents that are on the project planholder's list (see Item 1 above). The City will not be responsible for or bound by any oral instructions or ad The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include: Accessible Parking regrade on asphalt parking lot. Accessible path from Pool entrance Gate to accessible parking removal and replacement. Existing planter removal, installation of new stormwater treatment planter in place. Installation of new Level 2 EV chargers and related infrastructure. Partial parking lot restriping. CHANGES IN SCOPE OF WORK The City reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work or to omit any item or portion of the work. The City reserves the right to add similar work at other locations throughout the City.

Award

Sidewalks / Parking Lot

$662,090.00

Public - City

Site Work

22

14

25

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
268
Bidding Soon
2,901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 2, 2026

Project location map

Ashbury Avenue, El Cerrito, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.