BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Demolition, site work and addition to a golf course in Dennis, Massachusetts. Completed plans call for the addition of a 1,490-square-foot golf course; for the demolition of a golf course; and for site work for a golf course.

Addition to the existing golf cart wing of the the clubhouse building. Work will include the expansion of the unfinished, unisualted portion of the building. Filed Subs Bids will include Fire Protection and Electrical only. The Work consists of two small projects at two individual sites, these projects will be bid Separately (however the bid manual for both bids is exactly the same. A. Project #1 is the Addition to the existing Golf Cart Storage wing of the existing Clubhouse Building at the Dennis Highlands Golf Course. B. Project #2 is the Renovation & Addition the the existing detached Golf Cart Storage Building at the Dennis Pines Golf Course. C. Both Projects will require separate and unique Bid Submissions through the ProjectDog online bidding portal. D. The work and all work incidental thereto, in accordance with the Construction Documents which include separate Drawing Packages for each location and this Specification Manual. Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner. Question Deadline 12/24/2025 Every request for such interpretation should be in writing addressed to Kurt Raber, Project Manager, Catalyst Architecture / Interiors Inc. via email addressed to kurt@catalystarchitects.com with the "Read Receipt" selected to confirm receipt of the email, and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids

Post-Bid

Golf Course

$650,000.00

Public - City

Addition, Demolition, Site Work

37

35

30

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
4
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

March 13, 2026

Project location map

825 Old Bass River Rd, Dennis, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.