Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Demolition, site work and addition to a golf course in Dennis, Massachusetts. Completed plans call for the addition of a 1,490-square-foot golf course; for the demolition of a golf course; and for site work for a golf course.
Addition to the existing golf cart wing of the the clubhouse building. Work will include the expansion of the unfinished, unisualted portion of the building. Filed Subs Bids will include Fire Protection and Electrical only. The Work consists of two small projects at two individual sites, these projects will be bid Separately (however the bid manual for both bids is exactly the same. A. Project #1 is the Addition to the existing Golf Cart Storage wing of the existing Clubhouse Building at the Dennis Highlands Golf Course. B. Project #2 is the Renovation & Addition the the existing detached Golf Cart Storage Building at the Dennis Pines Golf Course. C. Both Projects will require separate and unique Bid Submissions through the ProjectDog online bidding portal. D. The work and all work incidental thereto, in accordance with the Construction Documents which include separate Drawing Packages for each location and this Specification Manual. Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner. Question Deadline 12/24/2025 Every request for such interpretation should be in writing addressed to Kurt Raber, Project Manager, Catalyst Architecture / Interiors Inc. via email addressed to kurt@catalystarchitects.com with the "Read Receipt" selected to confirm receipt of the email, and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids
Post-Bid
Golf Course
$650,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 13, 2026
825 Old Bass River Rd, Dennis, MA
Related To This Project
Dennis, MA
Bid Date: Jan 28 2026
Dennis, MA
Bid Date: Feb 19 2026
Dennis, MA
Bid Date: Feb 24 2026
Dennis, MA
Bid Date: Mar 31 2026
Dennis, MA
Bid Date: Feb 04 2026
Dennis, MA
Bid Date: Jan 05 2026
Dennis, MA
Bid Date: Sep 05 2025
Dennis, MA
Bid Date: Apr 14 2025
Dennis, MA
Bid Date: May 13 2025
Dennis, MA
Bid Date: Mar 28 2025
Dennis, MA
Bid Date: Sep 16 2021
Dennis, MA
Bid Date: Dec 19 2024
Dennis, MA
Bid Date: Sep 19 2024
Dennis, MA
Bid Date: Sep 19 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
