Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2026 at 7:00 PM
Updated January 8, 2026
Renovation of a water / sewer project in Kyle, Texas. Completed plans call for the renovation of a water / sewer project.
Grant #DR4586-0042 The Work consists of providing the necessary labor, materials, equipment, supervision, and plant to purchase, factory test, and deliver one (1) mobile generators to City of Kyle Well No. 4 facility including but not limited to, bonds and insurance; Minimum 500-kW diesel engine driven trailer mounted generator with sound attenuated weatherproof enclosure and 24-hour storage tank; delivery of generator to the project sites, factory testing, and all else detailed in the specifications. The Work consists of the construction of a new stand-by diesel engine generator with a weatherproof sound attenuated enclosure, sub-base fuel tank, generator slab, grounding system, automatic transfer switch, underground duct bank, conduit and wire for all locations listed in the table below. Additional work at specific sites includes but is not limited to modifications to existing electrical service rack, chain link fence modifications, concrete pavement, DFS Panel modifications and miscellaneous site work. Project: Generator Site Additions Located at: Lehman Booster Pump Station:150 Agate Lake Drive, Kyle, TX 78640 Yarrington Booster Pump Station: 1193 Yarrington Drive, Kyle, TX 78640 Well 3 & Booster Pump Station: 260 N. Old Stagecoach Rd, Kyle, TX 78640 Wells 1 & 5 Booster Pump Station:225 Veterans Drive , Kyle, TX 78640 Masonwood Lift Station: 642 Masonwood Dr, Kyle, TX 78640 Kensington Trails Lift Station: 110 Anton Dr, Kyle, TX 78640 Well 2 & Pump Station: 701 W. Moore St, Kyle, TX 78640 Well 4: 751 Kohlers Crossing, Kyle, TX 78640 Question Deadline 12/19/2025 at 5:00 PM CT Obtain clarification prior to submitting any Proposal by posing questions via the City's Procurement Portal website Owner anticipates that the Project's total cost will be approximately $3,000,000. The Project has an expected duration of 440 calendar days.
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2026
March 9, 2026
Multiple Locations, Kyle, TX
Related To This Project
Kyle, TX
--
Kyle, TX
--
Kyle, TX
--
Kyle, TX
--
Kyle, TX
Bid Date: Feb 19 2026
Kyle, TX
Bid Date: Feb 10 2026
Kyle, TX
Bid Date: Feb 10 2026
Kyle, TX
Bid Date: Jan 15 2026
Kyle, TX
--
Kyle, TX
--
Kyle, TX
Bid Date: May 30 2019
Kyle, TX
Bid Date: Jan 08 2026
Kyle, TX
Bid Date: Jan 08 2026
Kyle, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
