BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and new construction of a laboratory facility in Gainesville, Georgia. Completed plans call for the construction of a 38,850-square-foot laboratory facility; and for site work for a laboratory facility.

The Georgia State Financing and Investment Commission (GSFIC), on behalf of the Georgia Department of Transportation (DOT), is seeking firms interested in providing construction management at risk services for Project No. DOT-135, which involves a District-1 Headquarters and a Materials Testing Laboratory Building. Question Deadline 12/22/2025 at 2:00 PM ET All questions regarding this RFQ/RFP should be directed to the Procurement Representative Jeff Lacks Jeff.lacks@gsfic.ga.gov: (770)-550-3774 February 5, 2026 2:00 PM Deadline for written questions The Georgia Department of Transportation intends to construct an approximately 38,850 square foot district headquarters administration building and a new materials testing laboratory building on their existing District-1 site located at 2505 Athens Highway, SE, Gainesville, GA 30503. It is envisioned the new District Office will be constructed where the old District Office once stood. The old District Office building was demolished approximately four years ago. The design of the new District-1 Administration Office will be based on a prototype design that was previously used to construct Administration offices in Jesup, Carterville, and Tifton, Georgia. Construction documents from those previous projects are being site adapted for this project and will be completed prior to the completion of the design for the new materials testing laboratory, enabling construction to begin on the district office earlier than the start of construction for the branch laboratory. It is envisioned the new materials testing laboratory building will encompass roughly 7,500 square feet of program space. It is envisioned that the facility site work will be accomplished in two phases. The first phase being the site related to the District-1 Administration building only so that construction can start sooner and the second phase being the rest of the facility including drive lanes, parking and the Laboratory area. The lease for the space the GDOT District-1 Office is currently housed in will not be renewed at the end of the current lease term. Therefore, a target date for the completion of construction of the new administration space has been set for August of 2027. This will allow GDOT time to relocate into the new building prior to the lease expiring. The Design Professional is currently completing programming for the project with design of the district offices beginning in December 2025. The release of the construction documents for the project will be phased. An early package to begin site work could be issued as early as May 2026 with construction of the new District Office Building starting at the completion of the site. Construction drawings for the Laboratory will be made available later in 2026 allowing work to begin on that building. The construction duration for the completion of both buildings is estimated to take no more than a total of 15 to 16 months. The expectation is the construction of both buildings would be completed not later than August 2027.

GC Bidding

Laboratories

$14,922,125.00

Public - State/Provincial

New Construction, Site Work

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
155
Bidding Soon
1,928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

May 1, 2026

Project location map

2505 Athens Hwy, Gainesville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.