BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and paving for a mixed-use development in Newport Beach, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The work necessary for the completion of this contract consists of the following: o Distributing door hanger notifications o Placing "No Parking" signs and traffic control o Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters o Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary) o Patching areas of concrete curb and gutter and sidewalk o Protecting in place existing grade and subgrade of all concrete work o Restoring private improvements o Restoring survey markers damaged or displaced by the work o Painting curb face and tops red where applicable o Installing grass turf as necessary to match existing private grass turf o Providing temporary access during construction o And other incidental items to complete work in place as required by the Contact Documents No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Liquidated Damages $2000.00 Per Day Pre - Bid Meeting No Question Deadline 01/02/2026 at 10:00 AM PT Online Q&A Yes Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results.

Award

Sidewalks / Parking Lot

$429,400.00

Public - City

Paving, Site Work

3

12

3

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
723
Active Projects
307
Bidding Soon
3,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

March 9, 2026

Project location map

Multiple Locations, Newport Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.