BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work for a water / sewer project in Turbeville, South Carolina. Completed plans call for site work for a one-story above grade water / sewer project.

Furnish and install an emergency diesel generator at the water system lift station at 1655 Seloc Road, Turbeville, SC 29162. The generator is to be placed on a properly sized concrete pad meeting required manufacturer specifications. The minimum specifications needed are 200KW/60Hertz at 1,800RPM. Question Deadline 12/29/2025 at 12:00 PM ET Any requests for clarification or additional information deemed necessary by any Bidder to present a proper proposal must be submitted in writing as follows: Mail to: Santee-Lynches Regional COG Attn: Government Services Director 3219 Broad Street, Sumter, SC 29150 Section I. ORGANIZATION BACKGROUND Established in 1969, Santee-Lynches Regional Council of Governments (SLRCOG) is a state-chartered agency which provides a wide range of services to citizens, county governments, and municipalities within Clarendon, Kershaw, Lee, and Sumter counties. Santee-Lynches operates under the guidance of a twentynine-member Board of Directors comprised of elected officials and citizens-at-large from the four (4) county area and is one of ten such regional agencies in South Carolina. Section II. PURPOSE OF REQUEST The Santee-Lynches Regional Council of Governments (SLRCOG) is inviting bids to furnish and install an emergency diesel generator at the water system lift station at 1655 Seloc Road, Turbeville, SC 29162. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed. The location of placement is to be determined by the Owner and not to conflict with daily operations. Bids should include labor, material, and equipment to fully install and connect unit. (Note: This will not be a temporary installation unit.) It is recommended all potential bidders visit the sites to verify the current building electrical load capacity as well as electrical panel sizes for application. Site visits are by appointments only and requires at least 48-hour notice to Owner and/or its representative. Section III. ROLE OF CONTRACTOR/SCOPE OF WORK Responsibilities/Scope of Work include, but are not limited to: The contractor will be responsible for furnishing and installation of an emergency diesel generator for the water system lift station at 1655 Seloc Road, Turbeville, SC 29162. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed. Section IV. WORK EXECUTION Work should begin within 15 days of award and must be completed within 30 days. The Contractor understands and agrees that demolition and debris removal and site restoration in the most expeditious manner possible is of the utmost importance and it will make every effort to complete all requirements of this Contract in the shortest time possible. The Contractor shall maintain all work sites to appropriate use standards, safety standards, and regulatory requirements. All materials shall be removed, hauled, and disposed according to applicable federal, state and local requirements. The Contractor shall be responsible for compliance with all federal, state and local requirements related to structure demolition and removal.

Sub-Bidding

Water / Sewer

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
67
Bidding Soon
1,081
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 11, 2026

Project location map

1655 Seloc Rd, Turbeville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.