BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Renovation of an educational facility in Smithsburg, Maryland. Completed plans call for the renovation of a one-story above grade educational facility.

**As of January 21st, Borlie Mechanical Contracting, LLC was awarded for $964,469.** 2026-38 Chiller Replacement at Smithsburg Elementary School. The Bid documents can be found on the WCPS webpage at https://wcpspurchasing.com/group/2865/chiller-replacement-smithsburg-elementary-school. The final award recommendation and bid tabulation will be posted on the WCPS Bid Results after the Board of Education of Washington County approval at https://wcpspurchasing.com/bids/results. Question sent to Mr. Scott Bachtell Supervisor of Purchasing (WCPS) Phone (301) 766-2842; Email: bachtsco@wcps.k12.md.us Please copy Tyler Nally at Nallytyl@wcps.k12.md.us PROJECT DESCRIPTION A. This section outlines the Scope of Work for the Smithsburg Elementary School Chiller Replacement, 67 N. Main St., Smithsburg, MD 21783. The project consists of selective replacement and upgrade of the chilled water piping, pumps, chillers, condensers, and associated automatic temperature controls and supporting electrical work. The design includes two new (2) air-cooled split chillers, (2) primary chilled water pumps, air and dirt separator, expansion tank and variable speed drives. The split air-cooled chillers are direct replacements of the two existing split air-cooled chillers. B. The Contractor shall and will, in good workmanlike manner, do and perform all work and furnish all supplies and materials, machinery, equipment, facilities, and means, except as herein otherwise expressly specified, necessary or proper to perform and complete all the work required by this contract, within the time herein specified, in accordance with the provisions of this contract and said specifications and in accordance with the plans and drawings covered by this contract and any and all supplemental plans and drawings, and in accordance with the directions of the Board of Education, as given from time to time during the progress of the work. He shall furnish, erect, maintain, and remove such construction plant and such temporary works as may be required. He alone shall be responsible for the safety, efficiency, and adequacy of his plant, appliances, and methods, and for any damage which may result from their failure due to their improper construction, maintenance, or operation. The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements, and limitations of the contract and specifications and shall do, carry on, and complete the entire work to the complete satisfaction of the Board of Education.

Award

Educational

$964,469.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
197
Bidding Soon
2,733
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 2, 2026

Project location map

67 N Main St, Smithsburg, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.