BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work for a water / sewer project in Campbellsville, Kentucky. Completed plans call for site work for a water / sewer project.

The scope of work includes the installation of approximately 6,266 LF of 8-inch DI waterline, 92 LF of 16-inch steel casing pipe, 1 fire hydrant assembly, and related appurtenances. Each BIDDER must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. No BIDDER may withdraw his Bid within ninety (90) consecutive calendar days after the actual date of the opening thereof. Questions shall be addressed to Alan R. Robinson, P.E. of Eclipse Engineers, PLLC, 113 West Mt. Vernon Street, Somerset, Kentucky 42501 (606-451-0959) as stated in the Specifications or by email to arobinson@eclipseengineers.net. The OWNER reserves the right to waive any informality or to reject any or all bids. Doc Notes:A complete bid package (hardcopy set) is available for purchase of $200.00 or a download is available for purchase of $100.00 using your established Lynn Account or by using your credit card online. UPS Ground fee is $45.00. Place order by clicking the "Order/Download" button above. The Instructions to Bidders, Bid Form, Agreement Forms, Performance and Payment Bonds, Plans, Specifications and other Contract Documents may be viewed online or examined at the following locations: City of Campbellsville 109 West Main Street Campbellsville, KY 42718 (270) 465-7011 Eclipse Engineers, PLLC 113 West Mt. Vernon Street Somerset, KY 42501 (606) 451-0959. Partial sets of documents will not be provided. Half-sized sets may be purchased for the full price. Digital download sets may be purchase for half of the full price. A. The scope of work includes the installation of approximately 6,266 LF of 8-inch DI waterline, 92 LF of 16-inch steel casing pipe, 1 fire hydrant assembly, and related appurtenances. B. The Contractor shall include all materials, labor and equipment necessary for completion of the Project. The Contract Documents are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the Project shall be included. C. Continuous Operations: The existing system must be maintained in continuous operation in such a manner that it meets all local, state, and federal requirements. The Contractor is responsible not to deactivate, demolish, or interfere with any system required for the continuous operation until a temporary or new permanent-like system has been installed and is operational. The Contractor is responsible for payment of all fines resulting from any action or inaction on his part or the part of his subcontractors during performance of the Work that is illegal. D. The following major Work items are included in the Contract: 1. Waterline installation. 2. Tapping sleeve and valve installation. 3. Fire hydrant installation A. Various sizes, types and quality of crushed stone aggregates are specified in this Section depending on applicability which may be specified in detail in other sections of these Specifications. B. The Utilities Board may require the use of crushed stone aggregates for purposes other than those specified in this or other Specification sections if such use is advisable.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

10

11

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
111
Bidding Soon
1,029
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 9, 2026

Project location map

KY-70, Campbellsville, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.