Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published January 28, 2026 at 7:00 PM
Updated January 29, 2026
Renovation of a multi-residential development in Rome, Georgia. Completed plans call for the renovation of a multi-residential development.
Elevator modernization services for the Northwest Georgia Housing Authority are required under this solicitation. The work is categorized under elevator services, specifically elevator modernization, and will take place at the main office located at 326 W. 9th St., Rome, GA 30162. The contract will be a firm fixed-price type. No economic price adjustment option is included. The contractor shall provide complete labor and materials to modernize four (4) existing passenger hydraulic elevators, two in each building. Elevator work includes: 1. Non-proprietary microprocessor-based controller, drives, and selectors. o Install new, open-protocol controllers compatible with multiple service providers. o Include variable frequency drives (VFD) for smooth operation and energy efficiency. 2. Non-proprietary door operator and related equipment. o Replace door operators with non-proprietary models, including detectors, tracks, hangers, and interlocks. o Ensure compliance with fire safety and accessibility standards. 3. Jack seals (as needed). o Inspect and replace hydraulic jack seals if deterioration is found during the project. o Provide documentation of inspections and any replacements. 4. New signal fixtures, car and hall. o Install modern LED or digital signal fixtures, including position indicators, direction lanterns, hall buttons, fire service, and car operating panels. o Fixtures must be vandal-resistant and energy-efficient. 5. Accessibility provisions for physically disabled persons. o Ensure full compliance with ADA and ANSI A117.1 standards, including braille signage, audible signals, emergency communication systems (hands-free phone with visual indicators), and appropriate door timings. 6. Materials and accessories as required to complete the elevator modernization (controller, fixtures, and door operator). o Supply all necessary wiring, conduits, buffers, guides, pumps, valves, and other components. o Cab interior refurbishment: re-laminate walls, new LED ceiling, handrails, and flooring allowance o Include any required electrical, mechanical, or structural modifications. 7. Complete replacement of traveling cable, hoist way wiring, limits, buffers, and pit equipment 8. Safety upgrades: emergency battery lowering, UCM protection, seismic valve/gripper (if required), car-top inspection station 9. Full Category 5 testing by an independent inspector, permits, O&M manuals, diagnostic tools, and as-builts 10. All repairs shall be made as necessary to complete the entire Elevator Modernization in original condition, including all cutting, fitting, and drilling of masonry, concrete, metal, and other materials as specified or required for proper assembly, fabrication, installation, and completion of all Work under the Contract, and including any patching and redecorating as may be necessary. This includes all work in the elevator machine rooms, hoistways, Pits, cars, guide rails, brackets/fastenings, lobby hall stations, and all other areas of the Elevator Modernization. 11. Any provision that requires facilitating the removal of existing equipment and installation of new equipment in the machine rooms, lobbies, Pits, hoist ways, cabs, and repair thereof shall be the total responsibility of the Elevator Contractor. 12. All holes/cracks in the hoistways shall be sealed. All hoistway sides of the hall station boxes shall be sealed with fire-retardant material.
Award
Multi-Residential
$745,155.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2026
February 9, 2026
326 W 9th St, Rome, GA
Related To This Project
Rome, GA
--
Rome, GA
--
Rome, GA
--
Rome, GA
Bid Date: Mar 10 2026
Rome, GA
Bid Date: Dec 03 2025
Rome, GA
Bid Date: Nov 14 2025
Rome, GA
Bid Date: Dec 03 2025
Rome, GA
Bid Date: Nov 10 2025
Rome, GA
Bid Date: Nov 12 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed