Site work for a civil project in Sienna Plantation, Texas. Completed plans call for site work for a water / sewer project; and water / sewer project.
The bidders have been added. Please refer to the bid tabulation for detailed results Scope of Work includes water, sanitary sewer, and drainage facilities. Each bid must be accompanied by a bid bond or a certified or cashier’s check in an amount not less than two percent (2%) of the total amount bid, as a guarantee that the successful bidder will enter into the contract documents and execute the bonds on the forms provided, and provide the required insurance certificates and bonds within seven days after the contract documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder must deliver the original check at the bid opening address within one business day of receipt of the bid opening. Bidding documents may be examined at LJA Engineering, Inc., AGC of Texas, Construct Connect, and Amtek or may be obtained by prospective bidders or suppliers upon payment of $100.00 non-refundable plus delivery ($50.00 for electronic copy). Checks should be made payable to LJA Engineering, Inc. No cash will be accepted. Bidders submitting electronic bids must do so in compliance with Owner’s Order Adopting Section 49.2731 Electronic Bidding Rules and submit through https://bids.lja.com. Bidders must register and obtain bidding documents on this website for the required payment amount to submit an electronic bid. By submitting a bid, bidder acknowledges that the contract documents may be accepted, executed, or agreed to through the use of an electronic signature, as defined by and in accordance with Owner’s Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all bids and to waive all defects and irregularities in bidding except the time for submitting a bid. The successful bidder will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this bid and the bidder agrees that the contract documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter. ABidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request for such information to Engineer not less than seven (7) calendar days before the Bid opening. Name and Location of Project. Work covered by these Technical Specifications is entitled "Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Section 85" for Sienna Municipal Utility District No. 7, Fort Bend County, Texas. 2. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Construct and adjust storm sewer, manholes and appurtenances; (4) Repair existing pavement affected; (5) Furnish and install all subsidiary items as necessary to complete the project; (6) Perform testing as specified on installed lines; and (7) Clean-up project area upon completion
Bid Results
Water / Sewer
$2,514,336.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
March 30, 2026
To be determined, Sienna Plantation, TX
Related To This Project
Sienna Plantation, TX
Bid Date: Jan 15 2026
Sienna Plantation, TX
--
Sienna Plantation, TX
Bid Date: Oct 07 2025
Sienna Plantation, TX
Bid Date: Oct 24 2025
Sienna Plantation, TX
--
Sienna Plantation, TX
Bid Date: Jul 23 2025
Sienna Plantation, TX
--
Sienna Plantation, TX
Bid Date: Feb 20 2025
Sienna Plantation, TX
Bid Date: Mar 15 2019
Sienna Plantation, TX
Bid Date: May 16 2019
Sienna Plantation, TX
Bid Date: May 02 2019
Sienna Plantation, TX
Bid Date: Sep 04 2020
Sienna Plantation, TX
Bid Date: Apr 01 2021
Sienna Plantation, TX
--
Sienna Plantation, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.