BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 2, 2026 at 7:00 PM

Updated January 5, 2026

Renovation of a mixed-use development in Yosts, New York. Completed plans call for the renovation of a 36,604-square-foot, three-story above grade educational facility.

Maybrook Alternative Learning Center - 2025 Cap. Proj. 44-13-01-06-0-002-016 Montgomery Elementary School - 2023 Cap. Proj. Ph 3 44-13-01-06-0-004-017 Montgomery Elementary School - 2024 Cap. Proj. 44-13-01-06-0-004-019 Montgomery Elementary School - 2025 Cap. Proj. 44-13-01-06-0-004-020 East Coldenham Elementary School - 2023 Cap. Proj. Ph 3 44-13-01-06-0-013-021 East Coldenham Elementary School - 2024 Cap. Proj. 44-13-01-06-0-013-022 East Coldenham Elementary School - 2025 Cap. Proj. 44-13-01-06-0-013-023 Valley Central High School - 2023 Cap. Proj. Ph 1 44-13-01-06-0-015-033 Valley Central High School - 2024 Cap. Proj. 44-13-01-06-0-015-035 Valley Central Middle School - 2023 Cap. Proj. Ph 3 44-13-01-06-0-016-024 Valley Central Middle School - 2024 Cap. Proj. 44-13-01-06-0-016-025 Valley Central Middle School - 2025 Cap. Proj. 44-13-01-06-0-016-028 Berea Elementary School - 2023 Cap. Proj. Ph 1 44-13-01-06-0-017-014 Berea Elementary School - 2024 Cap. Proj. 44-13-01-06-0-017-016 The Owner, the Valley Central School District will receive sealed bids to furnish material and labor to complete the Valley Central School District - Capital Projects which includes renovations and alterations. Each bid shall be on a stipulated sum basis for the following Contract No. 02 Mechanical Construction (MC) Bidder must provide Bid Security in the amount and form, per the terms indicated in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, reject any Bid and return Bid Security prior to that date. A full performance bond, together with labor and material payment bonds in form acceptable to Owner shall be required of the successful Bidder for the full contract amount. This project is publicly funded. The Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Valley Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. Doc Notes: It is the intention of this Project to be both environmentally and fiscally conscious of paper use and consumption. Therefore, documents will be distributed as digital sets. Bidding Documents, Drawings, and Specifications may be viewed online free of charge beginning 12-15-2025 at online under 'Public Projects', or electronically downloaded for a non-refundable fee of one-hundred dollars ($100.00). Any bidder requiring (CD's) to be shipped shall make arrangements directly with the printer and pay for all packaging and shipping costs. Any bidder requiring paper copies of the Bidding Documents, Drawings and Specifications shall make arrangements directly with the printer and pay for all printing, packaging and shipping costs. Such costs are non-refundable. Sitewalkthrough notes: Walkthroughs will commence after the Pre-Bid Conference at Berea Elementary School, Valley Central Middle School, Valley Central High School, Montgomery Elementary School, and Maybrook Alternative Learning Center. Attendance of this meeting is recommended as the Owner, Architect and/or consultants will be present to discuss the Project. Deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring (CDs) to be shipped shall make arrangements directly with the printer and pay for all packaging and shipping costs. Question Deadline 01/09/2026 No interpretation of the meaning of the Contract Documents, the existing conditions, or of the scope of Work will be made verbally. Provide every request for such interpretation in writing, addressed to CSArch, Attention: Dion Miller, 19 Front Street, Newburgh, NY, by e-mail: dmiller@csarchpc.com, and to be given consideration must be received at least five (5) working days prior to the date of the Bid Opening.

Sub-Bidding

Educational

$1,440,900.00

Public - City

Renovation

255

27

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
114
Bidding Soon
1,313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2026

February 16, 2026

Project location map

Multiple Locations, Yosts, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.