BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Site work for a power facility in L'Etang-du-Nord, Quebec. Completed plans call for site work for a power facility.

Reference number: 20112493 Deadline for receipt of complaints 2026-01-19 Question Deadline 02/12/2026 Subject: Iles-de-la-Madeleine / Qualification call / Progressive design and construction - New thermal power plant at Cap-aux-Meules For information and without commitment from Hydro-Quebec, the order of magnitude including options is: greater than $100,000,000 Request for Information: Must be addressed to the Lead Person at least three business days prior to the deadline date and time for receiving bids. Object description: CALL FOR QUALIFICATION / Progressive design-construction Hydro-Quebec intends to carry out the "Construction of a new thermal power plant at Cap-aux-Meules" (the "Project") according to a progressive design-build (PAB) approach. The project includes the design of the plant, supply of equipment (except for power units) and various materials, construction, construction management up to the commissioning and commissioning phases. Here is the non-exhaustive list of design and construction themes included in the project: Excavation; Foundations; Structures; Drainage; Building envelope; Electricity / Lighting; Electrical distribution; Connection to the starting station; Mechanical systems; Fuel supply systems; Exhaust gas system; Heat recovery system for engines and chimneys; Equipment auxiliary to the motorization; Installation of the engine groups; Start-up and commissioning; Etc. The above list is non-exhaustive, several other themes and sub-themes will be included in the project, for example: emission control, cooling, fuel storage, HVAC systems, glycol supply, plumbing, fire system, overhead cranes, acoustic enclosures, earthworks, emergency generators, electrical room, various architectural elements and interior fittings, control systems, equipment for the health and safety of workers such guards, lifting equipment, soundproofing, etc. It should be noted that Hydro-Quebec will be responsible for all regulatory authorization activities as well as preliminary impact studies. Those interested can obtain the tender documents at https://fournisseurs.hydroquebec.com/page.aspx/fr/bpm/process_manage_extranet/24194

Post-Bid

Power Plant

$100,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

February 18, 2027

Project location map

1034 Chem. de la Vernière, L'Etang-du-Nord, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.