Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a road / highway in Davenport, Florida. Design plans call for site work for a road / highway.
FPID# 201210-5: US 27 (SR 25) Interchange at I-4 (SR 400) from South of Ernie Caldwell Boulevard to Ritchie Road and I-4 (SR 400) Auxiliary Lanes from US 27 (SR 25) to CR 532. Segment 1 is from south of Ernie Caldwell Boulevard to Ritchie Road (MP 23.10 to MP 24.49), a project length of approximately 1.4 miles. In the existing condition, US 27 (SR 25) is an urban arterial with three 12-foot travel lanes in each direction. This project will address operational deficiencies of the existing US 27 (SR 25) interchange by modifying and improving the I-4 (SR 400) ramp terminal intersections at US 27 (SR 25), providing a grade-separated intersection at US 27 (SR 25) and Home Run Boulevard/Posner Boulevard, increasing the number of travel lanes along US 27 (SR 25) within the project limits, and creating a frontage road along southbound US 27 (SR 25) from Home Run Blvd. to south of I-4 (SR 400). A proposed shared-use path will be added to the median of US 27. Segment 2 is I-4 (SR 400) Auxiliary Lanes from US 27 (SR 25) to CR 532 (MP 29.25 to MP 32.0), a project length of approximately 2.8 miles. I-4 (SR 400) currently has three 12-foot travel lanes in each direction with these limits. The proposed improvements will add a 12-foot auxiliary lane in each direction on the outside of the existing travel lanes. FPID # 201210-7: Backage Road from Home Run Boulevard to Frontage Road. The project proposes to add a new urban road “Backage Road” west of US 27 (SR 25) and south of I-4 (SR 400) from Home Run Boulevard to Frontage Road, a distance of approximately 2,200 feet. The proposed two-lane road will include a bike lane and a sidewalk in each direction. Additionally, the project would extend Heller Court to the new road and add two additional roundabouts. Ultimately, there are three major intersections in these projects that will be reconstructed. US 27 (SR 25) at I-4 (SR 400), North Ramp (at Frontage Road), including RCUT US 27 (SR 25) at I-4 (SR 400), South Ramp, including RCUT US 27 (SR 25) at Posner Boulevard /Homerun Boulevard As of April 21, 2026, this project is in the design phase. Construction is expected to start in the spring of 2027.
Design
Roads / Highways
$250,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2027
FL-25, Davenport, FL
Related To This Project
Davenport, FL
--
Davenport, FL
Bid Date: May 05 2026
Davenport, FL
--
Davenport, FL
Bid Date: Apr 13 2026
Davenport, FL
Bid Date: Mar 26 2026
Davenport, FL
--
Davenport, FL
Bid Date: Mar 10 2026
Davenport, FL
Bid Date: Mar 19 2026
Davenport, FL
Bid Date: Dec 23 2025
Davenport, FL
Bid Date: Apr 01 2026
Davenport, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
