BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Davenport, Florida. Design plans call for site work for a road / highway.

FPID# 201210-5: US 27 (SR 25) Interchange at I-4 (SR 400) from South of Ernie Caldwell Boulevard to Ritchie Road and I-4 (SR 400) Auxiliary Lanes from US 27 (SR 25) to CR 532. Segment 1 is from south of Ernie Caldwell Boulevard to Ritchie Road (MP 23.10 to MP 24.49), a project length of approximately 1.4 miles. In the existing condition, US 27 (SR 25) is an urban arterial with three 12-foot travel lanes in each direction. This project will address operational deficiencies of the existing US 27 (SR 25) interchange by modifying and improving the I-4 (SR 400) ramp terminal intersections at US 27 (SR 25), providing a grade-separated intersection at US 27 (SR 25) and Home Run Boulevard/Posner Boulevard, increasing the number of travel lanes along US 27 (SR 25) within the project limits, and creating a frontage road along southbound US 27 (SR 25) from Home Run Blvd. to south of I-4 (SR 400). A proposed shared-use path will be added to the median of US 27. Segment 2 is I-4 (SR 400) Auxiliary Lanes from US 27 (SR 25) to CR 532 (MP 29.25 to MP 32.0), a project length of approximately 2.8 miles. I-4 (SR 400) currently has three 12-foot travel lanes in each direction with these limits. The proposed improvements will add a 12-foot auxiliary lane in each direction on the outside of the existing travel lanes. FPID # 201210-7: Backage Road from Home Run Boulevard to Frontage Road. The project proposes to add a new urban road “Backage Road” west of US 27 (SR 25) and south of I-4 (SR 400) from Home Run Boulevard to Frontage Road, a distance of approximately 2,200 feet. The proposed two-lane road will include a bike lane and a sidewalk in each direction. Additionally, the project would extend Heller Court to the new road and add two additional roundabouts. Ultimately, there are three major intersections in these projects that will be reconstructed. US 27 (SR 25) at I-4 (SR 400), North Ramp (at Frontage Road), including RCUT US 27 (SR 25) at I-4 (SR 400), South Ramp, including RCUT US 27 (SR 25) at Posner Boulevard /Homerun Boulevard As of April 21, 2026, this project is in the design phase. Construction is expected to start in the spring of 2027.

Design

Roads / Highways

$250,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
220
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

FL-25, Davenport, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.