BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Renovation of a stadium in Tampa, Florida. Completed plans call for the renovation of a stadium.

Provide labor, equipment and materials to refinish the main concourse traffic coating at RJS. Bid Bond : Yes he final day for asking questions regarding this ITB is Friday, January 9, 2026 not later than 10am. All questions regarding this Invitation to Bid/Proposal must be submitted in writing and emailed to bids@tampasportsauthority.com. General Requirements: o Provide all labor, tools, and equipment necessary to professionally refinish approximately 141,400 square feet (70,700 SF per side) of the Main concourse traffic coating at Raymond James Stadium. The square footage includes all main concourse restrooms (17,760 SF), twelve (12) emergency stair landings (4,650 sq ft) and six (6) Premium Area Smoking Decks (6,750 sq ft) o Install owner provided durable, non-skid, flexible, waterproofing traffic coating system with excellent UV, chemical, and wear resistance, and near seamless repairability. o Perform all work in accordance with manufacturer's specifications and industry's best practices. o Coordinate with Tampa Sports Authority (TSA) and their representatives to minimize disruption and facilitate facility usage. o Complete all work by April 17, 2026 (HARD DEADLINE), with multiple mobilizations/de-mobilizations due to event schedule. o Normal working hours are 6:30 AM to 5:00 PM, Monday through Friday. Any work outside these hours is possible (even encouraged) but requires prior approval from TSA. o TSA will provide a schedule of space availability Demolition and Surface Preparation: To ensure maximum adhesion and bonding direct to concrete - remove existing coatings down to bare, sound concrete substrate. To achieve this the following must take place: o Remove (and re-install) all portables concession stands, portable tables, and permanent tables (with anchor bolts) from concourse in accordance to event schedule. o Mask off all concession stands, restrooms, stairs, and floor drains with heavy duty painters' tape, and plastic sheeting to prevent dust and particle contamination. o Achieve a Concrete Surface Profile (CSP) of 5 or higher per ICRI guidelines using a minimum of two (2) PCD planetary diamond grinders with industrial HEPA vacuum filtration. o Implement all appropriate dust mitigation procedures. o Vacuum and clean concrete surface thoroughly, removing all contaminants. o Properly and safely remove and dispose of all debris. o Maintain a clean work area and transport all refuse to the TSA provided dumpster on ground level. (Do not overload the dumpsters) o Please note: ALL areas that are not getting coated or prepped are to be fully protected from any destructive damage and dust. Concrete Repair: o Ensure substrates are dry and free of laitance and unsound concrete. o Inspect and repair concrete imperfections (holes, voids, fins). o Grind protrusions smooth and fill voids with system-compatible filler/grout. Coating System Application: o Mask off all restrooms, walls, stairs, expansion joints, and floor drains with heavy duty painters' tape, and plastic sheeting to prevent paint and material from splattering, splashing, dripping, or running. o Apply 4-6 mil (320 Sqft per gallon) of high-strength, deep-penetrating concrete substrate reinforcing primer. Primer material provided by TSA. o Apply 20 mil (80 Sqft per gallon) of flexible, elastomeric waterproofing body coat (membrane). Membrane material provided by TSA. o Back roll body coat to achieve a smooth, consistently even surface. o Broadcast 20-30 grit silica aggregate (ASTM C136) to full rejection for a non-skid texture. Contractor to provide 20-30 silica aggregate material. o Vacuum ALL excess aggregate with industrial HEPA vacuums. o Apply a pigmented, polyaspartic topcoat in two (2) layers. Topcoat material provided by TSA. o Apply first layer of topcoat at 10 mils (160 Sqft per gallon). o Apply 4 mils (320 Sqft per gallon) second layer of topcoat or wear coat (with aggregate if required). Equipment and Materials: o Provide generators (and fuel) for areas without available electrical service. o Accept, offload, transport, and store materials in a cool, dry location within the work area. o Provide minimum of two (2) grinders with Industrial HEPA Vacuums. Proof of possession (e.g., invoices, rental agreements, or photos) shall be required. o Provide fuel (if needed for equipment) o Provide all brooms, brushes, tape, masking materials, trash bags, surface protection (for mixing), carts, pallet jacks, forklifts, and tools. o Provide squeegees, rollers and all approved applicator tools for applying the product. (proof of possession of appropriate tools shall be required) o Provide caulk, grout, or system compatible filler as necessary. o Provide 20-30 grit silica aggregate.

Award

Arenas / Stadiums

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
166
Bidding Soon
2,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

February 20, 2026

Project location map

4201 N Dale Mabry Hwy, Tampa, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.