Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a water / sewer project in Ramona, California. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

Work in general includes but is not limited to: - Installation of Approx. 13,240 LF of 16-in C900 (DR-14) PVC Waterline. - Installation of Fire Hydrants, Blow Offs, Combination Air-Release Valves, Check and Butterfly valves, water services. - Pressure Reducing Station - As needed temporary highline - Connection to existing pipelines - Traffic control - Paving - Concrete - Compaction Testing Discrepancies in, and/or omissions from the Bid or Contract Documents or questions as to their meaning shall be immediately brought to the attention of the District by submission of a written request for an interpretation or correction to the District. Any such submission must be sent to the Ricardo Soto, P.E. by emailing rsoto@rmwd.org, NO LATER THAN 4:00 PM ON JANUARY 15, 2026. Prospective bidders MAY visit the Site without making arrangements through the District. WORK COVERED BY CONTRACT DOCUMENTS A. The Work shall generally include construction of water replacement pipeline, as shown on the Approved Plans and Specifications, in accordance with District standards and other jurisdictional agency requirements, including the following: 1. Construction of 16-inch potable water pipeline starting at the intersection of Olive & Elm St and continuing along Elm Street to Haverford Rd., continuing east on Haverford Rd to Pamo Rd, then continuing north on Pamo Rd to Pile Street and east on Pile Street to Magnolia Ave., where it will tie into the existing 20-inch potable water pipeline at the intersection of Pile St & Magnolia Ave/Black Canyon Rd in accordance with the Approved Plans, including all associated materials, service connections, appurtenances and other Work. B. The Contractor shall keep the District and Construction Manager fully advised as to his schedule to complete the Work and obtain the District's and Construction Manager's approval for all phases of his operations, as hereinafter specified.

GC Bidding

Water / Sewer

$8,000,000.00

Public - City

Paving, Site Work

39

9

18

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
200
Bidding Soon
2,194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

April 13, 2026

Project location map

Multiple Locations, Ramona, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.