Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2026 at 7:00 PM
Updated February 6, 2026
Site work for a water / sewer project in Hobart, Oklahoma. Completed plans call for site work for a water / sewer project.
Drinking Water - Water Meter System Replacement for City of Hobart / Hobart Public Works Authority (DWSRF Project No. P40-1011502-01). Scope includes furnishing and installing water meters and related equipment as follows (three product options provided): Option A - Neptune Water Meters: 1,684 5/8" x 3/4" Mach 10 R900 Meters, 90 1" Mach 10 R900 Meters, 28 1.5" Mach 10 R900 Meters, 31 2" Mach 10 R900 Meters, 4 3" Mach 10 R900 Meters, 2 4" Mach 10 R900 Meters, 1 Data Collector with Tablet, 1 Gateway and Installation, and installation of each meter size. Option B - Sensus Water Meters: 1,684 5/8" x 3/4" iPerl Meters, 90 1" iPerl Meters, 28 1.5" Omni Meters, 31 2" Omni Meters, 4 3" Omni Meters, 2 4" Omni Meters, 1,684 Smart Points - 520M - Single Port, 1 Data Collector with Tablet, 1 Gateway and Installation, and installation of each meter size. Option C - Master Meter Water Meters: 1,684 5/8" x 3/4" Sonata Ultrasonic Meters, 90 1" Sonata Ultrasonic Meters, 28 1.5" Octave Ultrasonic Meters, 31 2" Octave Ultrasonic Meters, 4 3" Octave Ultrasonic Meters, 2 4" Octave Ultrasonic Meters, 1 Data Collector with Tablet, 1 Gateway and Installation, and installation of each meter size. All work shall be performed and all construction and material used and furnished shall be in accordance with the Plans and Specifications prepared by Myers Engineering and on file with the City of Hobart / Hobart Public Works Authority. Instructions to Bidders: - All bids shall be publicly opened and read aloud at the time stated in the notice. - Complete sets of Plans and Specifications are available for purchase. - Each original bid must be accompanied by a certified or cashier's check or Bidder's Bond for 5% of the bid amount as a guarantee to enter a contract and furnish required bonds within ten days of acceptance. - Required documents with each bid include a DW-412 Non-collusion Affidavit and a DW-413 Business Relationships Affidavit. - Performance, Maintenance, and Statutory Payment Bonds (100% of contract price) by a corporate surety licensed in Oklahoma are required. - Maintenance Bond for one year after acceptance is required. - Compliance with federal laws and regulations is required, including Equal Opportunity in Employment, DEQ Small, Minority, Women's Businesses Requirements, Anti-Kickback Act, Contract Work Hours Standards Act, Davis Bacon Act wage rules, American Iron and Steel provisions, and Build America, Buy America (BABA) Act. - System for Award Management (SAM) registration is required for all applicants, contractors, subcontractors, and vendors. - The contract will be awarded to the lowest responsive, responsible bidder. The Owner reserves the right to waive informalities and reject any or all bids. Conditional bids are not accepted. Option A - Neptune Water Meters VANGUARD UTILITY SERVICES - $147,774.87 Option B - Neptune Water Meters VANGUARD UTILITY SERVICES - $147,774.87 Option C - Neptune Water Meters VANGUARD UTILITY SERVICES - $147,774.87
Bid Results
Water / Sewer
$1,301,881.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
February 16, 2026
To be determined, Hobart, OK
Related To This Project
Hobart, OK
Bid Date: Jan 14 2026
Hobart, OK
Bid Date: Nov 24 2025
Hobart, OK
Bid Date: Jun 23 2025
Hobart, OK
--
Hobart, OK
Bid Date: Oct 09 2024
Hobart, OK
Bid Date: Jul 11 2024
Hobart, OK
Bid Date: Jun 17 2024
Hobart, OK
Bid Date: Jun 20 2024
Hobart, OK
Bid Date: May 08 2024
Hobart, OK
Bid Date: May 20 2024
Hobart, OK
Bid Date: Mar 20 2024
Hobart, OK
Bid Date: Mar 27 2024
Hobart, OK
Bid Date: Mar 05 2024
Hobart, OK
Bid Date: Feb 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
