Site work and paving for a road / highway in Fayetteville, Georgia. Completed plans call for site work for a road / highway.
**As of January 27, 2026, the project was awarded to Holbrook Asphalt, with an awarded amount of $237,146.91.** Fayette County, Georgia invites bids for HA5 High Density Mineral Bond. Bids should be submitted in accordance with the provided instructions. Responses must be returned to the Fayette County Purchasing Department at the specified address. Bids must be sealed and show the company's name and address. Late, faxed, or emailed bids cannot be considered. Bids must be signed to be considered. If the invitation is downloaded from the county's website, it is the vendor's responsibility to check for any addenda. Questions about the invitation should be addressed in writing to the designated contact. Office hours and contact numbers are provided. Fayette County, Georgia is seeking bids from qualified contractors to provide HA5 High Density Mineral Bond at the following locations: The successful contractor SHALL provide two coats of HA5 High Density Mineral Bond to an estimated 53,053 SY of roads that were previously sprayed with HA5. Mobilization and traffic control will be paid with the line item of HA5 High Density Mineral bond by square yard. Contractor will clean all pavement before HA5 installation. This includes removing plant materials from cracks, edges where asphalt meets curb and gutter and joints and blow cracks with compressed air. Fayette County will arrange all patching and crack sealing. Glen Grove Subdivision-Edmondson Way (3,940 SY), Byington Dr.-(5,127 SY). Brechin Park Subdivision- Bramlet Ct. (1,973 SY), Bontura Dr-(7,506 SY), Brechin Dr.-(8,720 SY), Densmorr Ridge-(1,051 SY), Fenhurst Point-(1,477 SY). Shoreline Subdivision-Shoreline Dr.-(6,938 SY). Providence Subdivision-Holly Amber Lane-(1,551 SY), St. Clair Ct.-(1,101 SY), Imperial Way-(5,282 SY). Murphy Creek Lane-(8,386 SY). Glen Grove Subdivision is a quiet community of 47 homes located just North of Fayetteville off of Brogdon Rd. This Subdivision has only one entry/exit point off of Brogdon Rd. Providence Subdivision is a quiet community of 35 homes located in the North portion of Fayette County off of SR 279 Hwy. This Subdivision has only one entry/exit point off of SR 279. Shoreline Subdivision is a small quiet community of 31 homes located Southeast of Fayetteville off of County Line Rd. This Subdivision has only one entry/exit point off of County Line Rd. Brenchin Park Subdivision is a quiet community of 81 homes. Located in the South portion of Fayette County off of SR. 74 Hwy. This Subdivision has only one entry/exit point off of SR. 74 East Bound side. Murphy Creek Lane is a quiet community of 29 homes. Located off of Hilo Rd. South of Fayetteville GA This Subdivision has only one entry/exit point off of Hilo Rd. Contractor MUST warrant their work for a period of (5) years when applied to pavement in appropriate condition. The warranty includes coverage for peeling and premature wear. Final mat appearance will have no runoff onto-concrete curb and gutters and shoulders, no streaking, no light spots, and no de-bounding due to road contaminants. Mineral Bond will be placed on in appropriate weather that will allow it to dry and have traffic back on the new treated surface no longer than 10 hours. Contractor will meet with the County and with each Subdivision Homeowner's Association (HOA) to agree upon a construction schedule and road closure plan. Contractor will be responsible for all traffic control during the project. Contractor will be responsible for transportation of residents from their homes to a designated parking area during the drying stage. Each Subdivision HOA will provide the contractor with a list of garbage companies that are being used by the Subdivision for the contractor to coordinate with. Contractor will prepare and distribute a flyer to the affected residents with contact information numbers to request transportation in advance of the project beginning. County will supply a general information letter to the affected residents of the project in advance of the project. Road closure plan needs to be approved by the County a month before the work is scheduled to begin. All work must be completed by June 30th, 2026. Question Deadline: Date: 2025-12-18 15:00, Details: Questions should be addressed to Sherry White via email to swhite@fayettecountyga.gov or fax to (770) 305-5208.
Award
Roads / Highways
$237,147.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
January 29, 2026
To be determined, Fayetteville, GA
Related To This Project
Fayetteville, GA
Bid Date: Jan 20 2026
Fayetteville, GA
Bid Date: Jan 14 2026
Fayetteville, GA
--
Fayetteville, GA
--
Fayetteville, GA
--
Fayetteville, GA
Bid Date: Feb 03 2026
Fayetteville, GA
Bid Date: Dec 18 2025
Fayetteville, GA
Bid Date: Dec 19 2025
Fayetteville, GA
Bid Date: Dec 19 2025
Fayetteville, GA
Bid Date: Dec 19 2025
Fayetteville, GA
Bid Date: Dec 17 2025
Fayetteville, GA
Bid Date: Dec 18 2025
Fayetteville, GA
Bid Date: Dec 18 2025
Fayetteville, GA
Bid Date: Dec 02 2025
Fayetteville, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.