BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Demolition and site work for a residential development in Lincoln, Illinois. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Property: - Remove structure in its entirety, to include all materials provide for the construction and remodeling of said structure and pertaining appurtenances. Foundation material (concrete, block, brick etc.), wall and roof framing and all interior/exterior finish systems and materials associated. - All mechanical, electrical and plumbing supply, distribution and fixture materials to be removed. - All accessory structures pertaining to the property to be removed in their entirety i.e. garages, sheds, fences etc. to include all foundations and associated slabs. - All debris, garbage, and refuse material found present in all structures to be removed. - All below grade footers, foundations and slabs to be removed in their entirety. Site/Utility: - All site driveways and sidewalks contained within the property lines to be removed. All sidewalks and portions of driveways within the public right of way to remain, damage to City Property or that of neighboring private properties during any phase of demolition will be repaired at the contractor's expense. - Removal of all utilities to origin of private service. - The Building and Safety Department will coordinate with the applicable utility companies to confirm the shut off and abandonment of service. o Storm and/or sanitary sewer lines to be capped at location inside the property line and to be inspected by a Sewer Department representative prior to backfill. o Water to be abandoned onsite. - Overgrown weeds, brush and trees/stumps deemed unsafe by the Building and Safety Department to be removed. - All debris, garbage, tires, appliances, vehicles and refuse material etc. present on the property to be removed. - Backfill where foundations removed. Property to be graded to match existing contours and provide for proper drainage so as not to encroach on neighbor properties. Final grading should be seeded and left in a "ready to mow" condition at completion.

Award

Residential Subdivision

$5,995.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
1
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

February 5, 2026

Project location map

224 Williamette Ave, Lincoln, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.