BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and paving for a mixed-use development in Orlando, Florida. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

SR 534 from Cyrils Drive to Nova Road (3 projects). As of January 13, 2026, this project remains in the planning stage, and an engineer has not yet been appointed. The selection of a design firm is anticipated for 2026. Design work is expected to conclude in 2028, followed by the bidding phase in 2029. Construction is projected to begin in 2029 and continue through 2032.

Conceptual

Roads / Highways

$168,252,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
140
Bidding Soon
2,036
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2029

Project location map

FL-417 Toll, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.