BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work and paving for a mixed-use development in Hawthorn Woods, Illinois. Completed plans call civil work for a bridge / tunnel, road / highway and sidewalk / parking lot.

The project includes milling and resurfacing at multiple locations totaling 9,170 linear feet (1.74 miles) in Hawthorn Woods. Work consists of 4.25" surface removal and replacement with HMA Surface Course 2" and HMA Binder Course 2.5", as well as 2" surface removal and replacement with HMA Surface Course 1.5" and Polymerized HMA Binder Course 0.75". Class D patches Type I-IV (8"); installation of PCC Shoulders (9"), PCC shoulder removal, driveway removal and replacement, drainage improvements, pavement marking, and restoration are also included. The base bid covers the listed streets and the Public Works Parking Lot. Alternate 1 Bid adds CMP pipe culvert removal and replacement with 15" Storm Sewer, Class B, Type 1, 15" at the Acorn Dr HOA property. The Village will select the low bidder based on its budget and may award the base bid, alternate, or combinations thereof, and may delete streets from the bid with no adjustment to unit prices. Pre-qualification: Required Pre-Qualification: Yes Base Bid: Wayne Lane - Bruce Circle to N Cul-De-Sac (0.10 MI) Tanglewood Ct - Tanglewood Ln to N Cul-De-Sac (0.15 MI) Tanglewood Ln - Brierwoods Ln to W Limit (0.11 MI) Robin Crest Rd - Bruce Circle S To E Cul-De-Sac (0.39 MI) Lydia Ct - Acorn Dr to S Cul-De-Sac (0.14 MI) Echo Ct - Acorn Dr to E Cul-De-Sac (0.12 MI) Brierwoods Ct - Brierwoods Ln to N Cul-De-Sac (0.06 MI) Bruce Circle N - Brierwoods Ln to S Cul-De-Sac (0.11 MI) Bruce Circle S - Bruce Circle N To Acorn Dr (0.25 MI) Acorn Dr - Bruce Circle N To Bruce Circle S (0.12 MI) Acorn Dr - Bruce Circle N To Robin Crest Rd (0.11 MI) Public Works Parking Lot (35 N. Old McHenry Rd., Hawthorn Woods) (not shown in plans) Alternate 1 Bid: (Base Bid + Following Location) Acorn Dr HOA Property - Pipe Culvert Removal and Replacement Basis of Award: The Village will choose the "low bidder" based upon Village's budget, and the total for the Base Bid and Alternate Bid or any combination of Alternate Bid. The Village may also delete streets from the Bid with no adjustment to unit prices. Project Length: 9,170 Linear Feet (1.74 MI) Completion- 25 working days Q&A 01/12/2026 at 4:00 PM CT

Post-Bid

Roads / Highways

$900,000.00

Public - City

Paving, Site Work

40

8

4

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
812
Active Projects
433
Bidding Soon
4,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

February 16, 2026

Project location map

To Be Determined, Hawthorn Woods, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.