BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated February 5, 2026

Site work and paving for a civil project in Ermine, Kentucky. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Estimated Length of Project: (Substantial Completion) + 120 calendar days (Final Completion) This site will consist of closing mine portals behind the Collins residence. Water from the portals has affected Mr. Collins barn and is slowly deteriorating. Being installed will be five mine portal standard wildlife closures. Along with hoe ramming the top of all five mine portals. The access road to the portals will need graded and ditches pulled. To help with drainage around the barn 250 LF of 8-inch subdrain pipe will be installed behind the barn along the bench area where three portals will be closed. To drain the water off the bench area 50 LF of 8-inch HDPE pipe will be use to divert water down the hill into a class two ditch with 2-foot bottom 250 feet long. The other two mine portals around the mountain side will not be affecting any structures. Project limits will be a total of 5.27 Acres with a maximum total area to be disturbed for this project will be 2.78 Acres. Question Deadline 01/12/2026 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.

Bid Results

Water / Sewer

$101,483.00

Public - State/Provincial

Paving, Site Work

4

5

8

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
70
Bidding Soon
700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 2, 2026

Project location map

14 W Wind Ln, Ermine, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.