BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work and paving for a road / highway in Bridgeton, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project consists of Concrete Pavement Replacement on select City streets within the St. Gerard and St. James Subdivisions, located near Fee Fee Road and Natural Bridge Road, just north of Highway 70. Anticipated subdivision streets include Avery Lane, Benedetta Drive, Lockport Drive, and Majella Drive. Sealed bids will be received for this project. Questions regarding this project should be directed to, Robert E. Gunn P.E., Director of Public Works at (314) 739-7665. Bidders may request clarification or interpretation of the Bidding Documents by making a written request which shall reach the City at least seven (7) days prior to the date for receipt of Bids.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

18

6

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
125
Bidding Soon
1,287
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

February 16, 2026

Project location map

Multiple Locations, Bridgeton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.