Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
This is a service / maintenance or supply contract in Salt Lake City, Utah. Contact the soliciting agency for additional information.
Metro Water relies on ultrasonic flow meters for accuracy in billing and chemical feed. Several of these flow meters are replaced each year as part of Metro Water’s asset management. For ease of maintenance, including technical support and spare parts, Metro Water desires to standardize on a manufacturer and supplier for the upcoming replacement cycle. Vendors meeting the requirements are invited to provide a proposal. Specifications for the ultrasonic flow meters include: - Time transit technology using 1-20 acoustic paths, independent of water temperature. - Supports filled pipes measuring up to 10 feet. - Capable of measuring up to 20 paths or 4 measurement sections. - Modular design with controller, ultrasonic transit modules, power supply with surge protection, transducers, and cables. - Individually replaceable components. - Enclosures: standard steel (IP65), stainless-steel heated (IP66), or custom/existing cabinets. - Compatible with Rittmeyer and Accusonics internal/feedthrough transducers. - Web-based configuration via built-in HTML server (no special software). - Signal rejection for unreliable or distorted signals. - Path replacement strategy to maintain measurement accuracy during path loss. - Replaceable, non-proprietary power supply supporting: 19.2–60 VDC, 125–300 VDC, 110 VAC, 220 VAC. - 3–7 analog outputs: 4–20 mA. - 7–15 digital outputs. - Modbus RTU/TCP (optional). - 2 analog inputs (4–20 mA). - 1 digital input. Proposals are to be submitted electronically via U3P. Any proposals received after the specified time will not be considered. It is the Vendor’s responsibility to assure submission of the proposal. Proposals received after the deadline will not be considered (special or extenuating circumstances may permit a grace period as deemed reasonable by Metro Water).
Post-Bid
Water / Sewer
$200,000.00
Public - County
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
February 13, 2026
To be determined, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: Jan 20 2026
Salt Lake City, UT
Bid Date: Jan 13 2026
Salt Lake City, UT
Bid Date: Jan 08 2026
Salt Lake City, UT
Bid Date: Nov 12 2025
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Jan 15 2026
Salt Lake City, UT
Bid Date: Jan 20 2026
Salt Lake City, UT
Bid Date: Jan 27 2026
Salt Lake City, UT
Bid Date: Jan 31 2026
Salt Lake City, UT
Bid Date: Jan 27 2026
Salt Lake City, UT
Bid Date: Jan 13 2026
Salt Lake City, UT
Bid Date: Nov 25 2025
Salt Lake City, UT
Bid Date: Jan 27 2026
Salt Lake City, UT
Bid Date: Dec 31 2025
Salt Lake City, UT
Bid Date: Feb 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
