Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Site work and paving for a mixed-use development in Broken Arrow, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This project consists of intersection improvements to expand the 9th Street and Washington Street Intersection to 5-lanes in each direction including two through lanes in each direction and a left-turn lane on each leg of the intersection. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection and new traffic signals will be installed. In addition, new pavement striping and signing will be installed. The project also includes milling and overlaying of existing asphalt with new full depth asphalt construction for widening of the intersection. The total contract time for this project shall be two hundred and ten (210) days. Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but City of Broken Arrow may require such statements prior to award of the construction contract. The References, Statement of Qualifications & Experience and the Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the References, Statement of Qualifications & Experience and/or the Statement of Key Personnel Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to City of Broken Arrow a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: waterline, asphalt, and retaining wall work. Such list shall be accompanied by a Statement of Qualifications & Experience as well as a Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If City of Broken Arrow or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, City of Broken Arrow may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, City of Broken Arrow may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by the City of Broken Arrow, submit to City of Broken Arrow the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price.
Award
Roads / Highways
$2,256,008.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2026
March 23, 2026
S 9th St & E Washington St, Broken Arrow, OK
Related To This Project
Broken Arrow, OK
Bid Date: Jan 06 2026
Broken Arrow, OK
Bid Date: Jan 29 2026
Broken Arrow, OK
Bid Date: Jan 14 2021
Broken Arrow, OK
Bid Date: Feb 24 2026
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: Apr 01 2026
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: Jan 15 2026
Broken Arrow, OK
Bid Date: Jan 13 2026
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: Jan 08 2026
Broken Arrow, OK
Bid Date: Dec 23 2025
Broken Arrow, OK
Bid Date: Dec 16 2025
Broken Arrow, OK
Bid Date: Dec 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
