Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 5, 2026 at 7:00 PM
Updated February 6, 2026
Site work and paving for a mixed-use development in Orlando, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Description: The Improvements under this Contract consist of milling and resurfacing, shoulder treatment, curb & gutter, sidewalk, traffic signals, and signing/pavement markings on State Road 482 (Sand Lake Road) from east of Orange Blossom Trail to Orange Avenue, approximately 2.085 miles in Orange County. Prequalification Required. Total Roadway Length: 2.023 Miles Contract Days: 190 Total Bridge Length: 0.062 Miles Total Proposal Length: 2.085 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Flex Question Deadline 01/27/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online FDOT - 002 - Resurfacing - State Road 482 (Sand Lake Road)
Bid Results
Roads / Highways
$4,744,979.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2026
February 13, 2026
Sand Lake Rd, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Feb 19 2026
Orlando, FL
Bid Date: Feb 03 2026
Orlando, FL
Bid Date: Jan 29 2026
Orlando, FL
--
Orlando, FL
Bid Date: Feb 10 2026
Orlando, FL
Bid Date: Jan 08 2026
Orlando, FL
Bid Date: Feb 05 2026
Orlando, FL
Bid Date: Feb 04 2026
Orlando, FL
Bid Date: Jan 05 2026
Orlando, FL
Bid Date: Jan 30 2026
Orlando, FL
Bid Date: Jan 15 2026
Orlando, FL
--
Orlando, FL
Bid Date: Feb 05 2026
Orlando, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
