Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2026 at 7:00 PM
Updated March 7, 2026
Renovation of a detention facility in Lexington, South Carolina. Working plans call for the renovation of a detention facility.
As of March 06, 2026, project was not awarded. No definite date for the rebid. The County of Lexington and Lexington County Sheriff's Department are seeking competitive bids for the replacement of three (3) sally port doors at the Lexington County Detention Center. The work includes removal and replacement of three complete rolling gates and operating assembly systems with specified models and upgrades. The vendor must confirm all measurements during a mandatory pre-bid walkthrough. Proposals must be turn-key and include all costs for ordering, fabrication, installation, and removal of existing gates. No substitutions are allowed. Subcontractors are not permitted and the department desires one vendor to complete the project. The vendor must be 100% bonded. Question Deadline 01/20/2026 at 2:00 PM ET All Questions Regarding This Solicitation Must Be Submitted in Online. The County of Lexington and Lexington County Sheriff's Department are seeking competitive bids for the replacement of three (3) sally port doors at LCDC. The Scope of Work shall consist of: - Removal and replacement of three (3) complete rolling gates/operating assembly systems o One (1) 11' 1" x 11' 6" estimate o One (1) 9' 2" x 11' estimate o One (1) 11' 7" x 10' 10" estimate Replace gates with Clopay Model C5015 with High Cycle Construction Upgrade to 100,000 cycles with safety edge Replace operating assembly with Cornell Cookson SGH Series 5011 E Logic Surface Mount - must include auxiliary chain - Vendor is responsible for confirming all precise measurements during mandatory prebid walk through - Proposal must include all costs associated with ordering, fabricating, and installing turn-key fully operational gates and the removal of existing gates. - No substitutions - Not open to subcontractors; department desires one vendor who can complete the entire project - Must be 100% bonded
Final Planning
Jails / Prisons
$200,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
September 7, 2026
521 Gibson Rd, Lexington, SC
Related To This Project
Lexington, SC
Bid Date: Feb 10 2026
Lexington, SC
Bid Date: Feb 10 2026
Lexington, SC
Bid Date: Feb 10 2026
Lexington, SC
Bid Date: Feb 18 2026
Lexington, SC
Bid Date: Feb 23 2026
Lexington, SC
Bid Date: Feb 10 2026
Lexington, SC
Bid Date: Mar 16 2026
Lexington, SC
Bid Date: Mar 05 2026
Lexington, SC
Bid Date: Dec 30 2025
Lexington, SC
Bid Date: Jan 08 2026
Lexington, SC
--
Lexington, SC
--
Lexington, SC
Bid Date: Feb 02 2026
Lexington, SC
Bid Date: Jan 13 2026
Lexington, SC
Bid Date: Dec 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
