Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and transportation facility.
ENGINEERS ESTIMATE: $8,010,490 - $10,235,626 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK The Work of this Contract includes, but is not limited to, construction of: 1. New Bus Platform Located at the Burien Transit Center. a. Removal of the existing bus platform, curb access ramp, shelter and station stop amenities on the on the west side of the Burien Transit Center. Work also includes removal of concrete pavement along the existing buslanes where necessary to install the bus charging equipment. Work must be completed in an active transit facility while maintaining bus operations. b. Construct new bus platform with 9-inch vertical curb, construct new curb access ramp and install Detectable Warning Surface. c. Construct foundations for a new shelter, pylon, ticket vending machine and other station amenities. d. Install underground conduit for system and electrical items on the new bus platform. This contract only includes installation of conduit and vaults/pull boxes. e. Installation of owner furnished INDUCT EV precast coil socket and installation of conduit for future BEB charging equipment installed by others. f. Install conduit between the new bus platform and the new transformer. 2. Addition of New Bus Only Lane along SW 148th Street/SR 518. a. Removal of the existing median islands, curb, sidewalk as specified on the Contract Drawings. b. Reconstruction of curb, sidewalk and driveways as specified on the Contract Drawings. Question Deadline 02/02/2026 at 5:00 PM PT online submission. Pre-Bid Meeting 01/13/2026 at 1:30 PM
Award
Transportation Terminals
$6,092,484.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
May 26, 2026
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jan 19 2026
Seattle, WA
Bid Date: Feb 25 2026
Seattle, WA
Bid Date: Jan 28 2026
Seattle, WA
Bid Date: Nov 23 2026
Seattle, WA
Bid Date: Feb 03 2026
Seattle, WA
Bid Date: Feb 04 2026
Seattle, WA
Bid Date: Mar 27 2026
Seattle, WA
Bid Date: Feb 19 2026
Seattle, WA
Bid Date: Feb 13 2026
Seattle, WA
Bid Date: Feb 04 2026
Seattle, WA
Bid Date: Jan 13 2026
Seattle, WA
Bid Date: Jan 21 2026
Seattle, WA
Bid Date: Feb 03 2026
Seattle, WA
Bid Date: Dec 22 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed