Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Renovation of a municipal facility in Monroe, Louisiana. Completed plans call for the renovation of a 21,000-square-foot municipal facility.
The project is titled City Court Roof Repairs Project for the City of Monroe. It is categorized under roofing and involves roof repairs at the City Court location in Monroe, Ouachita County, LA. No additional scope of work or instructions to bidders are provided in the available text. The City of Monroe is soliciting quotes for a comprehensive roof restoration project at the City Courthouse located at 600 Calypso St, Monroe, LA 71201. The project encompasses a designated roof section of approximately 21,000 square feet and requires a multi-stage SPF (Spray Polyurethane Foam) restoration and silicone coating system. The selected contractor will be responsible for the following phases of work: 1. Surface Preparation and Scarification: The contractor must mechanically scarify the existing coated SPF roofing system to remove all degraded coating and foam. This process must expose and agitate the existing foam substrate to ensure optimal adhesion for new materials. All resulting debris must be collected, bagged, and removed, leaving the roof surface clean and dry per manufacturer requirements. 2. Primer Application: A manufacturer-approved primer specifically designed for scarified SPF substrates must be applied at the required coverage rate. This primer must be allowed to cure according to specifications to ensure a proper chemical bond before the next stage. 3. Spray Polyurethane Foam Installation: Contractor will install an additional 1-inch average thickness of closed-cell spray polyurethane foam over the primed surface. This application is intended to restore uniform slope, increase water resistance, and reinforce the existing roofing system. Installation methods and foam density must comply with all industry and manufacturer standards. 4. Silicone Coating System: A 100% silicone roof coating system must be applied over the new foam in multiple passes to achieve a minimum 28 dry mil thickness (DFT) across the entire area. This coating must fully encapsulate the foam surface, including all seams, transitions, and penetrations. For more information about the project or to schedule a site visit, contact Richard Moore at (318) 329-3426 or by email at richard.moore@ci.monroe.la.us
Award
Municipal
$154,255.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2026
February 11, 2026
600 Calypso St, Monroe, LA
Related To This Project
Monroe, LA
Bid Date: Jan 06 2026
Monroe, LA
--
Monroe, LA
Bid Date: Mar 03 2026
Monroe, LA
Bid Date: Feb 10 2026
Monroe, LA
Bid Date: Feb 24 2026
Monroe, LA
Bid Date: Feb 19 2026
Monroe, LA
--
Monroe, LA
Bid Date: Jan 05 2026
Monroe, LA
Bid Date: Dec 29 2025
Monroe, LA
Bid Date: Dec 22 2025
Monroe, LA
Bid Date: Dec 08 2025
Monroe, LA
--
Monroe, LA
Bid Date: Dec 09 2025
Monroe, LA
Bid Date: Dec 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
