Site work for a water / sewer project in Fairview, Oklahoma. Completed plans call for site work for a water / sewer project.
Major Co. RWD #1 is requesting bids for the construction of a water main replacement from Wells to NS249 Rd. The project includes installation of the following: 21,222 LF 8" PVC C900 DR18 Waterline, 15 LF 6" PVC C900 DR18 Waterline, 15 LF 5" PVC C900 DR18 Waterline, 11 LF 4" PVC C900 DR18 Waterline, 12 LF 2" PVC C900 DR18 Waterline, 180 LF Bore & Install 14" Steel Casing, 230 LF Bore & Install 14" Steel Casing with 2" Schedule 40 Steel Vent pipe on each end, 1 8" Interconnection, 1 6" Interconnection, 3 5" Interconnection, 1 4" Interconnection, 2 2" Interconnection, 7 8" Gate Valve & Box, 1 6" Gate Valve & Box, 1 4" Gate Valve & Box, 1 2" Gate Valve & Box, 5 8" Air Release Valve, 7 Single Short Service, 3 Single Long Service, 1 LS Clearing & Grubbing, 1 LS Construction Traffic Control, 1 LS Erosion Control, and 1 LS Hydraulic Pressure Testing and Disinfection. The expected duration of the project is 150 consecutive calendar days. Specifications are available for review at the office of Major Co. RWD #1 and at Myers Engineering, Consulting Engineers, Inc. Prospective bidders must obtain plans and specifications from the office of the Engineer and be registered on the Engineer's bid list to be recognized as an eligible bidder. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders included in the Bidding Documents. The project is subject to the Build America, Buy America Act (BABAA) requirements. Question Deadline 01/24/2026 A. Email your questions to jenniferf@mecokc.com and levib@mecokc.com. B. Call with questions: (405)755-5325, ask for Abigail Stewart. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$768,391.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
March 30, 2026
Multiple Locations, Fairview, OK
Related To This Project
Fairview, OK
Bid Date: Jan 22 2026
Fairview, OK
Bid Date: Nov 03 2021
Fairview, OK
Bid Date: Jan 16 2026
Fairview, OK
Bid Date: Jul 09 2025
Fairview, OK
--
Fairview, OK
Bid Date: Dec 13 2024
Fairview, OK
Bid Date: Nov 14 2024
Fairview, OK
Bid Date: Aug 15 2024
Fairview, OK
Bid Date: Jun 27 2024
Fairview, OK
Bid Date: Jul 10 2024
Fairview, OK
Bid Date: Apr 24 2024
Fairview, OK
Bid Date: Sep 15 2023
Fairview, OK
Bid Date: Mar 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.