BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2026 at 8:00 PM

Updated July 19, 2026

Renovation of a transportation facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a transportation facility.

The Work includes but is not limited to: Design of the South Broad Street Stations ADA (Accessibility) Improvement Project. The work will be executed through multiple prime contracts representing significant elements of work for each Contractor. The work shall be performed concurrently and in close coordination with the respective Prime Contractors listed in these construction documents, and ANY other trades working at the site. The General Contractor shall provide all labor, materials, equipment, insurance, bonds, permits, and services necessary to complete work. The contract for the General Contractor includes: two (2) new accessible elevators within the new headhouse and related structural improvements and renovations required for new elevators and support; new accessible headhouse containing the new elevators, new staircases, back of house spaces, and restrooms; structural repairs at various locations for concrete and steel elements, related waterproofing mitigation including crack injection and curtain injection; waterproofing systems on new concrete and existing structure applied from negative and/or positive side; accessible renovations to the emergency egress headhouses; new accessible doors, louvers, walls, and column surrounds; accessible improvements at street level; and civil work for plaza improvements, landscaping, other amenities, and coordination with impacted utilities. The Mechanical Contractor shall provide all labor, materials, equipment, insurance, bonds, permits, and services necessary to complete work. The contract for the Mechanical Contractor includes accessible installation of mechanical equipment in support of the new restroom, new elevator machine rooms, ticketing booth, and back of house spaces. New exhaust fan and MOD will be installed in the restroom. New electric unit heaters will be installe d in the restroom to provide supplemental heat. A new ductless split system will be installed in the ticketing booth. Two (2) new ductless split systems will be installed to provide cooling to the new elevator machine rooms. Ductless split systems for the elevator machinery rooms will have evaporator units within the machinery rooms on the platform level with condensing units located on the platform level. The Mechanical Contractor will also be responsible for installing ancillary equipment and accessories required for installation of the primary mechanical equipment including fan accessories, condensate pumps, refrigerant piping, plumbing, and fire protection work. The Electrical Contractor shall provide all labor, materials, equipment, insurance, bonds, permits, and services necessary to complete work. The contract for the Electrical Contractor includes providing a new accessible fire alarm system for the station. The new fire alarm system shall be addressable and contain capability of assuming all existing field devices which are currently in service, with equal quantities of new addressable field devices. Additional capability is required for field devices required to comply with the new design of the station, and the capability of interfacing with new elevators for performance of required capture and control operations. Electrical provisions shall be required for the new fire alarm control and support panels. Following the replacement of the existing fire alarm system, shall be the requirement to decommission and power down the existing fire alarm system for a complete removal of all existing fire alarm control and support equipment and the removal of all unused field devices, including wiring and conduit. All questions must be submitted, via email, to the Contract Administrator no later than Tuesday, July 7, 2026 at COB to be guaranteed an answer. SEPTA retains the right to reject any and all bids as determined to be in the best interest of SEPTA. Project no- 0100043399

GC Bidding

Transportation Terminals

$20,000,000.00

Public - State/Provincial

Renovation

368

39

547

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,017
Active Projects
26
Bidding Soon
7,207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

May 4, 2026

Project location map

S 8th St, Philadelphia, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.