Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 15, 2026 at 7:00 PM
Updated February 17, 2026
Site work for a water / sewer project in Roseville, Michigan. Completed plans call for site work for a water / sewer project.
Reference Number 0000408269 Abandon existing water main and replace with a new 8" water main along Gratiot Avenue from Martin to Elizabeth Street. Question Deadline 01/27/2026 at 4:00 PM ET Questions are submitted online No, All questions regarding this bid should be directed to Julia Bove at jbove@aewinc.com. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % A certified check, or the included Bid Bond, executed by the bidder and a surety company, payable to the City of Roseville, in an amount at least equal to five percent (5%) of the bid, shall be submitted with each bid. No bid may be withdrawn for a period of sixty (60) calendar days after the receipt of bids The successful bidder will be required to furnish satisfactory performance, payment, maintenance and guarantee bonds and insurance certificates. The City of Roseville reserves the right to reject any or all bids and/or to waive any irregularities in bidding. This work consists of providing a complete, color, audio-visual record of the construction area as it exists prior to the beginning of any construction activity This work consists of furnishing and installing new covers, including frames and grates, on new or existing structures as required. This work consists of furnishing, installing, maintaining, and removing a temporary pedestrian path as identified in the proposal or on the plans. Temporary pedestrian paths, or segments thereof, will be repaired or replaced as directed by the Engineer. This work consists of furnishing, installing, maintaining, relocating, and removing a temporary pedestrian ramp as identified in the proposal or on the plans. Use temporary pedestrian ramps to facilitate pedestrian travel on accessible facilities over curbs or other uneven terrain features with a vertical difference of 1/2 inch or greater. Damaged pedestrian ramps will be replaced as directed by the Engineer. This work consists of preparing all lawns and slopes on non-freeway projects designated for slope restoration on the plans or as directed by the Engineer and applying topsoil, fertilizer, seed, mulch with mulch anchor, mulch blanket, high velocity mulch blanket, permanent turf reinforcement mat, bonded fiber matrix, or modified mulch blanket to those areas. Ensure turf establishment is in accordance with section 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer. This work consists of removing gate valves and wells from the existing water main. This work includes furnishing all labor, equipment, and materials required for excavation and backfilling as shown on the plans and specified herein.
Bid Results
Water / Sewer
$359,728.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 9, 2026
Gratiot Ave, Roseville, MI
Related To This Project
Roseville, MI
--
Roseville, MI
Bid Date: Mar 06 2026
Roseville, MI
Bid Date: Apr 14 2026
Roseville, MI
Bid Date: Mar 05 2026
Roseville, MI
Bid Date: Mar 26 2026
Roseville, MI
--
Roseville, MI
Bid Date: Apr 23 2026
Roseville, MI
Bid Date: Mar 09 2026
Roseville, MI
Bid Date: Jan 22 2026
Roseville, MI
--
Roseville, MI
Bid Date: Nov 07 2025
Roseville, MI
Bid Date: Oct 08 2025
Roseville, MI
--
Roseville, MI
--
Roseville, MI
Bid Date: Sep 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
