BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work and paving for a sidewalk / parking lot in Marysville, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Marysville Exempted Village School District Pavement Improvements Project. For all labor, material, and services necessary for the Bidding of the District Pavement Improvements - Summer 2026 as described in the Contract Documents prepared by Schorr Architects, Inc. Direct all questions to Dan Miller at (614) 798-2096 or dmiller@schorrarchitects.com. All bids must be accompanied by a completed Bid Form and completed Bid Guaranty Contract Bond Form as described in the Instructions to Bidders. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Board of Education reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the responsibility of a bidder. Direct all questions to Dan Miller at (614) 798-2096 or dmiller@schorrarchitects.com.

Award

Sidewalks / Parking Lot

$545,900.00

Public - City

Paving, Site Work

6

10

8

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
7
Bidding Soon
1,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

May 27, 2026

Project location map

Multiple Locations, Marysville, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.