BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Demolition and site work for a mixed-use development in Carnegie, Pennsylvania. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; water / sewer project; and water / sewer project.

Work includes complete demolition of below listed structures; off-site disposal; backfilling; asbestos removal, if applicable; all utilities to be terminated and capped, as needed, pest control; site restoration and other ancillary items. The work generally consists of the demolition of one (1) residential building located on Boquet Street. Also included is pest control, erosion control, utility termination, and site restoration. The Contractor shall furnish all labor and materials and services, including transportation service and delivery for the completion of the project entitled: 819 Boquet Demolition McKees Rocks Borough A Labor and Materials Payment Bond, Performance Bond and Maintenance Bond in the amount of 100% of the bid amount will be required. The Char-West COG reserves the right to reject any and all bids in whole or in part, and to waive any informalities. Bids must be accompanied by a Bid Bond or a certified check made payable, without condition, to the Char-West COG in an amount no less than 10% of the bid or a certified check in the same amount. All recipients of funds should have a Data Universal Numbering System (DUNS) number and a CAGE CODE. Questions Due Date Dec 31st 2025, 4:00 PM EST

Award

Municipal

$22,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
196
Bidding Soon
1,955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 9, 2026

Project location map

819 Boquet St, Carnegie, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.