BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Renovation of a mixed-use development in Chicago, Illinois. Completed plans call for the renovation of a educational facility; and sidewalk / parking lot.

THE BOARD OF EDUCATION OF THE CITY OF CHICAGO invites prequalified General Contractors to bid on the project/projects referenced below. Bids must be submitted on the forms issued as part of the Bidding Documents. Bidding Contractors are required to be pre-qualified with the Chicago Public Schools for this project. The form of agreement for the work will be the General Contracting Services Agreement. This contract is subject to all of the terms and conditions of the General Contracting Services Agreement between the Board and General Contractor dated as of January 1, 2017. Scope of work includes various interior and exterior improvements to the existing school facility to facilitate ADA accessibility. Part of existing parking lot will be replaced with new access walkway to School Building. PAYMENT AND PERFORMANCE BOND: 100% of the Base Contract Price. BID BOND: A bid bond in the amount of five percent (5%) of the total Bid price is required. If printed copies are required by the Bidding Contractor, prints shall be made, at the Contractor's expense, from the electronic format provided by the Architect of Record. Event bid opening description: ONE (1) ORIGINAL AND TWO (2) COPIES OF THE BID SOLICITATION ARE TO BE SUBMITTED VIA BONFIRE. ORIGINAL SIGNATURE SETS TO BE SWORN TO BEFORE A NOTARY PUBLIC. ALL BIDS WILL BE OPENED AND READ VIA LIVESTREAM. A. Contractor shall provide all interface devices and software to provide an integrated system connecting Advanced Application Controllers, Application Specific Controllers, Building Controllers, and Gateways. The Control System Server provided by CPS will also be connected to the CPS's WAN. When it is a retrofit the contractor will install all the cabling per CPS Spec. For new schools the contractor will patch the controller to a data jack from the nearest "C" Box or MDF / IDF whichever is closest. CPS will patch that controller in the corresponding "C" Box, MDF, and IDF

Bid Results

Educational

$1,095,626.00

Public - City

Renovation

53

23

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
706
Active Projects
399
Bidding Soon
3,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.