BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Demolition, site work and new construction of a water / sewer project in Prairie du Chien, Wisconsin. Completed plans call for the construction of a water / sewer project; and water / sewer project.

The project consists of the construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A involves construction of a 1,200 gallon per minute municipal well to a depth of 106 feet, well development, performance pump testing, water quality analysis, erosion control, restoration of the work area, and other miscellaneous items in conformance with the contract documents. Contract B covers construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories, and controls. The building includes a pump room, chemical room, and restroom. The contract also includes installation of a natural gas-powered emergency electrical generator, erosion control, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items. It also includes demolition of the Well No. 2 Pumphouse, including building demolition, excavation, disconnection or abandonment of water main and other utilities, backfilling, grading, and site restoration. Existing equipment from Well No. 2 is to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned by removing and disposing or salvaging existing equipment, removing the casing to 3 feet below final grade, filling with approved materials, and submitting a Well/Drillhole Abandonment Report. Additionally, SCADA system updates include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse. All bids must be uploaded and submitted through Quest with an EJCDC C430 Bid Bond equal to five percent of the bid payable to the owner and must be accompanied by Bid Form 00 41 43. Bidders are required to pay not less than the Federal Davis-Bacon Prevailing Wage Rates. Domestic procurement and American Iron and Steel requirements must be met. Certification and documentation must be provided for compliance. No bidder may withdraw a bid within 30 days after opening. The City reserves the right to waive any informalities and to reject any or all bids. Disadvantaged Business Enterprises are encouraged to submit proposals.

GC Bidding

Water / Sewer

$3,000,000.00

Public - City

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
59
Bidding Soon
740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

March 27, 2026

Project location map

To be determined, Prairie du Chien, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.