BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Site work and paving for a road / highway in Beach, North Dakota. Completed plans call civil work for a road / highway.

As of March 31, 2026, project was awarded to Strata Corporation, awarded amount is $6,786,979.98. Contract No. 1 - Base Bid: Work generally consists of bonding, mobilization, surfacing removal, base recompaction, and surfacing replacement of the corridors of Main Street, Central Ave, and 6th St NW. The improvements include erosion control, traffic control, removal and installation of bituminous pavement, millings, concrete driveways, curb & gutter, valley gutter, sidewalk, concrete pavement, concrete base, aggregate base, subgrade preparation, adjusting manholes, gate valve boxes, inlets, and curb stops, installation of curb inlets and manholes, crosswalk restriping, and seeding and maintenance. Alternate work includes removal and installation of storm sewer system on 2nd Ave NE, including catch basins, curb inlets, manholes, RCP pipe, boring steel pipe, FES, riprap, concrete flume, asphalt paving, concrete replacement, backfilling, restriping, and topsoiling; 2" mill and overlay and chip sealing of 2nd Ave NE and intersection reconstruction at 2nd Ave NE and 1st St NE; and chip sealing of asphalt pavement in the Base Bid and other streets, as well as installation of a new valley gutter on 2nd St SE and 6th Ave SE. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Contract No. 1 - Alternate No. 1 - 2nd Ave NE Storm Sewer: Work generally consists of removing existing storm sewer system and installing a new system on 2 nd Ave NE. These improvements include removing 2 curb inlets and storm sewer pipe, removing 308 SY of asphalt paving, installation of a catch basin, installation of 4 curb inlets, 2 inlets specials, 2 72" manholes, installation of 55 LF of 30" RCP pipe, installation of boring 36" steel pipe for 241 LF, installation of a 36" RCP FES, installation of 41 CY of NDDOT Grade I riprap, installation of 4,156 SF concrete flume, installation of 308 SY of bituminous paving, concrete replacement, backfilling, restriping, and topsoiling.' Contract No. 1 - Alternate No. 2 - 2nd Ave NE Repaving: Work generally consists of 2" mill and overlay and chip sealing of the roadway on 2nd Ave NE and restriping and reconstructing the intersection of 2nd Ave NE and 1stSt NE. Contract No. 1 - Alternate No. 3 - Valley Gutter & Chip Sealing: Work generally consists of chip sealing of the asphalt pavement in the Base Bid as well as 1 st St NE and 5th Ave SE and the installation of a new valley gutter on 2 nd St SE and 6 th Ave SE. Major Components of the Project include: Work generally consists of construction associated with bonding, mobilization, surfacing removal, base recompaction, and surfacing replacement of the corridors of Main Street and Central Ave. Other components such as seeding, signing, site restorations, and storm sewer installation are included. Final completion- November 30, 2026. The pre-bid meeting will be conducted via Microsoft Teams conferencing: Video and Audio Link: https://nam12.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_NmZmOGEzZDItZmIwZC00NWVhLTgxYTMtNGUwMWY5ZjRjMGIx%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522b32addb5-f43d-4c2a-8383-dd63422a2655%2522%252c%2522Oid%2522%253a%25221aab19e0-6c1b-4cdf-af16-5344a69865aa%2522%257d&data=05%7C02%7CKyle.Kruckenberg%40AE2S.com%7Cc2d53f98f41940cadca408de4c9202ea%7Cb32addb5f43d4c2a8383dd63422a2655%7C0%7C0%7C639032387155074258%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DOs8YstrC5%2FJVbrUvbvNHfFnpCZzrxvy0%2BVKJDAS%2F3M%3D&reserved=0 online Bid Opening :- https://nam12.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_M2RhZGQ3ZjktMDdiNy00NDNkLWJhZGYtMWRlZjgxNzlkMmIz%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522b32addb5-f43d-4c2a-8383-dd63422a2655%2522%252c%2522Oid%2522%253a%25221aab19e0-6c1b-4cdf-af16-5344a69865aa%2522%257d&data=05%7C02%7CKyle.Kruckenberg%40AE2S.com%7C160babfb37ba4510b9b908de46eda6d8%7Cb32addb5f43d4c2a8383dd63422a2655%7C0%7C0%7C639026183672796349%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=NBLYIvTtd1ED3xz8iiMjErE1CSrq6%2BzTMl5suJrJW3E%3D&reserved=0

Award

Roads / Highways

$6,786,980.00

Public - City

Paving, Site Work

130

14

24

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 11, 2026

Project location map

Multiple Locations, Beach, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.